Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Surveys for the Lake Pontchartrain Bridge
The overall survey control for the Lake Pontchartrain Bridge, having a length of some 24 mi over open water, presented challenging problems both before and during construction. The control measures used prior to construction consisted of triangulation in one form or another. Alignment and stationing during construction were attained through the use of towers, repetitive measurements, ingeniously designed templates, and other adjustable positioning devices.
Surveys for the Lake Pontchartrain Bridge
The overall survey control for the Lake Pontchartrain Bridge, having a length of some 24 mi over open water, presented challenging problems both before and during construction. The control measures used prior to construction consisted of triangulation in one form or another. Alignment and stationing during construction were attained through the use of towers, repetitive measurements, ingeniously designed templates, and other adjustable positioning devices.
Surveys for the Lake Pontchartrain Bridge
Tuttle, James M. (Autor:in)
Transactions of the American Society of Civil Engineers ; 128 ; 42-53
01.01.2021
121963-01-01 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Surveys for lake Pontchartrain Bridge
Engineering Index Backfile | 1961
|Concrete bridge across Lake Pontchartrain
Engineering Index Backfile | 1961
|$5,500,000 bridge completed across lake pontchartrain
Engineering Index Backfile | 1928
ASCE | 2018
|Longest vehicular bridge starts across Lake Pontchartrain
Engineering Index Backfile | 1955
|