Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Vol2_011_July 1932
"1378 Fabricated steel forms for placing the 3-foot thick lining in the side wall section of the diversion tunnels being erected outside the upper portal of Diversion Tunnel No. 1. July 23rd, 1932. 1381 Apparatus devised for drilling grout holes through the concrete lining of the diversion tunnels. Air drills are mounted on bars. The grouting jumbo travels on rails laid on the invert floor. July 23rd, 1932. 1314 Workmen at isolated points away from drinking fountains are supplied by desert water bags. The picture shows a crew of ""water boys"" at the Arizona spillway. July 14, 1932 1315 Jackhamer men working on the floor of the Arizona spillway open-cut excavation. Workman in foreground is blowing dust from Jackhamer hole. July 14th, 1932" ; In 1931, Utah joined Six Companies Inc. to raise the surety required to bid for the Boulder (Hoover) Dam contract. One of the world’s largest dams, Hoover Dam was completed in 1936 at a cost of $49 million. These scrapbooks document through photographs the construction of the dam showcasing UCC's part in its creation. ; black and white photographs 4 x 5.3 in. or 8 x 4.8 in. paper background 10 x 13.5 in.
Vol2_011_July 1932
"1378 Fabricated steel forms for placing the 3-foot thick lining in the side wall section of the diversion tunnels being erected outside the upper portal of Diversion Tunnel No. 1. July 23rd, 1932. 1381 Apparatus devised for drilling grout holes through the concrete lining of the diversion tunnels. Air drills are mounted on bars. The grouting jumbo travels on rails laid on the invert floor. July 23rd, 1932. 1314 Workmen at isolated points away from drinking fountains are supplied by desert water bags. The picture shows a crew of ""water boys"" at the Arizona spillway. July 14, 1932 1315 Jackhamer men working on the floor of the Arizona spillway open-cut excavation. Workman in foreground is blowing dust from Jackhamer hole. July 14th, 1932" ; In 1931, Utah joined Six Companies Inc. to raise the surety required to bid for the Boulder (Hoover) Dam contract. One of the world’s largest dams, Hoover Dam was completed in 1936 at a cost of $49 million. These scrapbooks document through photographs the construction of the dam showcasing UCC's part in its creation. ; black and white photographs 4 x 5.3 in. or 8 x 4.8 in. paper background 10 x 13.5 in.
Vol2_011_July 1932
MS 100 Boxes 126-130
Bild
Elektronische Ressource
Englisch
DDC:
690