Sustainable green construction management: schedule performance and improvement
Over the last few years, the green building movement in Singapore has leaped bountifully. While environmental sustainability for greener construction has been emphasized, rare research has been conducted to analyze performance of green construction projects. As a result, this study aims to address schedule performance of green building construction projects and to provide some recommendations that may improve the targeted performance. To achieve this objective, a questionnaire was developed and the responses from 30 companies were analysed, and interviews with 6 project managers were conducted to further supplement and substantiate the survey results. The analysis reported that green building projects required an average of 8% more time than traditional building projects of similar size and characteristics. In addition, on average, these projects were delayed by 4.8% when compared with their as-planned schedules. Lastly, a list of recommendations was also introduced, aiming to ameliorate the schedule performance. This study will offer a benchmark for the industry to gauge the overall duration and performance of green building construction projects.
Sustainable green construction management: schedule performance and improvement
Over the last few years, the green building movement in Singapore has leaped bountifully. While environmental sustainability for greener construction has been emphasized, rare research has been conducted to analyze performance of green construction projects. As a result, this study aims to address schedule performance of green building construction projects and to provide some recommendations that may improve the targeted performance. To achieve this objective, a questionnaire was developed and the responses from 30 companies were analysed, and interviews with 6 project managers were conducted to further supplement and substantiate the survey results. The analysis reported that green building projects required an average of 8% more time than traditional building projects of similar size and characteristics. In addition, on average, these projects were delayed by 4.8% when compared with their as-planned schedules. Lastly, a list of recommendations was also introduced, aiming to ameliorate the schedule performance. This study will offer a benchmark for the industry to gauge the overall duration and performance of green building construction projects.
Sustainable green construction management: schedule performance and improvement
Hwang, Bon-Gang (Autor:in) / Leong, Lay Peng (Autor:in) / Huh, Young-Ki (Autor:in)
28.01.2014
doi:10.3846/20294913.2013.869669
Technological and Economic Development of Economy; Vol 19 No 1 (2013): Supplement; S43-S57 ; 2029-4921 ; 2029-4913
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
DDC:
690
Performance and improvement of green construction projects : management strategies and innovations
UB Braunschweig | 2018
|Improvement measures to achieve sustainable construction labour performance
Taylor & Francis Verlag | 2022
|Construction Schedule Visualization
British Library Conference Proceedings | 2002
|