Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Rencana Anggaran Biaya (RAB) pada pembangunan Mesjid berdasarkan Harga Satuan Standar Provinsi Sumatera Utara
The construction of a mosque requires careful budget planning so that the project can run smoothly and follow expectations. One of the critical steps in budget planning is to prepare a Cost Budget Plan (RAB) that is accurate and follows the unit price standards applicable in the area. This journal aims to present the RAB on the construction of mosques based on the Standard Unit Price of North Sumatra Province. This study's standard unit price data were obtained from official government sources and related institutions. The methodology used in this study includes field surveys, unit price data collection, and budget planning analysis. Field surveys were conducted to identify the needs of mosque construction and get a clear picture of the required specifications. Unit price data on building materials, construction work, and labour are obtained from reliable sources. Next, a budget planning analysis is carried out to calculate the estimated total cost of the mosque construction project. The results showed that the RAB on the construction of mosques based on the Standard Unit Price of North Sumatra Province provides accurate cost estimates and can be used as a guide in budget planning. The RAB includes costs for building materials such as bricks, cement, sand, and concrete iron, construction work such as installing roofs, floors, and walls, and the labour required in the construction process. This research is expected to contribute to the budget planning of mosque construction in North Sumatra and become a reference for parties involved in similar projects. By having an accurate RAB, it is hoped that the mosque's construction can run smoothly and efficiently per the plan set.
Rencana Anggaran Biaya (RAB) pada pembangunan Mesjid berdasarkan Harga Satuan Standar Provinsi Sumatera Utara
The construction of a mosque requires careful budget planning so that the project can run smoothly and follow expectations. One of the critical steps in budget planning is to prepare a Cost Budget Plan (RAB) that is accurate and follows the unit price standards applicable in the area. This journal aims to present the RAB on the construction of mosques based on the Standard Unit Price of North Sumatra Province. This study's standard unit price data were obtained from official government sources and related institutions. The methodology used in this study includes field surveys, unit price data collection, and budget planning analysis. Field surveys were conducted to identify the needs of mosque construction and get a clear picture of the required specifications. Unit price data on building materials, construction work, and labour are obtained from reliable sources. Next, a budget planning analysis is carried out to calculate the estimated total cost of the mosque construction project. The results showed that the RAB on the construction of mosques based on the Standard Unit Price of North Sumatra Province provides accurate cost estimates and can be used as a guide in budget planning. The RAB includes costs for building materials such as bricks, cement, sand, and concrete iron, construction work such as installing roofs, floors, and walls, and the labour required in the construction process. This research is expected to contribute to the budget planning of mosque construction in North Sumatra and become a reference for parties involved in similar projects. By having an accurate RAB, it is hoped that the mosque's construction can run smoothly and efficiently per the plan set.
Rencana Anggaran Biaya (RAB) pada pembangunan Mesjid berdasarkan Harga Satuan Standar Provinsi Sumatera Utara
Nasution, Adinda Juwita (Autor:in)
26.05.2023
doi:10.35308/jmkn.v9i1.7642
Jurnal Mekanova : Mekanikal, Inovasi dan Teknologi; Vol 9, No 1 (2023): April; 275-286 ; 25020498 ; 24775029 ; 10.35308/jmkn.v9i1
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
DDC:
690
ANALISIS RENCANA ANGGARAN BIAYA PEMBANGUNAN RUMAH TIPE 36 PADA PERUMAHAN DE’CIRCLE SAMARINDA
BASE | 2015
|RANCANG BANGUN APLIKASI PERHITUNGAN RENCANA ANGGARAN BIAYA (RAB) PEMBANGUNAN RUMAH TINGGAL
BASE | 2018
|