Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
A management maturity model (MMM) for project-based organisational performance assessment
Common sense suggests that organisations are more likely to deliver successful projects if they have systems in place that reflect a mature project environment based on a culture of continuous improvement. This paper develops and discusses a Management Maturity Model (MMM) to assess the maturity of project management organisations through a customisable, systematic, strategic and practical methodology inspired from the seminal work of Darwin, Deming, Drucker and Daniel. The model presented is relevant to organisations, such as construction and engineering companies, that prefer to use the Project Management Body of Knowledge (PMBOK™ Guide) published by the Project Management Institute (PMI), but without the disadvantages of excessive time and cost commitments and a ‘one size fits all’ approach linked to rigid increments of maturity. It offers a game-changing advance in the application of project-based organisational performance assessment compared to existing market solutions that are unnecessarily complex. The feasibility of MMM is field-tested using a medium-sized data centre infrastructure firm in Tehran.
A management maturity model (MMM) for project-based organisational performance assessment
Common sense suggests that organisations are more likely to deliver successful projects if they have systems in place that reflect a mature project environment based on a culture of continuous improvement. This paper develops and discusses a Management Maturity Model (MMM) to assess the maturity of project management organisations through a customisable, systematic, strategic and practical methodology inspired from the seminal work of Darwin, Deming, Drucker and Daniel. The model presented is relevant to organisations, such as construction and engineering companies, that prefer to use the Project Management Body of Knowledge (PMBOK™ Guide) published by the Project Management Institute (PMI), but without the disadvantages of excessive time and cost commitments and a ‘one size fits all’ approach linked to rigid increments of maturity. It offers a game-changing advance in the application of project-based organisational performance assessment compared to existing market solutions that are unnecessarily complex. The feasibility of MMM is field-tested using a medium-sized data centre infrastructure firm in Tehran.
A management maturity model (MMM) for project-based organisational performance assessment
Langston, Craig (Autor:in) / Ghanbaripour, Amir Naser (Autor:in)
01.01.2016
Langston , C & Ghanbaripour , A N 2016 , ' A management maturity model (MMM) for project-based organisational performance assessment ' , Construction Economics and Building , vol. 16 , no. 4 , pp. 68-85 . https://doi.org/10.5130/AJCEB.v16i4.5028
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
A Management Maturity Model (MMM) for project-based organisational performance assessment
BASE | 2016
|A Management Maturity Model (MMM) for project-based organisational performance assessment
DOAJ | 2016
|Capability maturity models for offshore organisational management
Online Contents | 2006
|Capability maturity models for offshore organisational management
Elsevier | 2006
|Assessing organisational project management capability
Emerald Group Publishing | 2003
|