Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Surrey LRT Optimal Station Locations
Over the next five to ten years, the City of Surrey is planning to build a Light Rail Transit (LRT)system comprised of two routes. The first route begins at Newton Exchange along King GeorgeBoulevard and continues to 104 Ave where it makes a right turn and terminates at 152 Street. Thesecond route begins at King George Station and continues along Fraser Hwy until it terminates atLangley Centre. One of the key decisions that must be made before construction of the Fraser Hwy route is theplacement of the transit stops. Placing stops requires balancing convenience, utilization, and costs.If too few stops are built, fewer people may use transit and some the bene1ts may not be fully realized. On the other hand, if too many stops are built, using the system may be more convenientfor more people but there will be the risk that some stops are underused and, therefore, the costof building and operating that particular stop may exceed the expected benefits.In this paper, we use linear programming methods to determine the most efficient placementof transit stops along Fraser Hwy from King George Station to Langley Centre. The goal will beto minimize costs while extracting as much bene1t as possible by balancing convenience andutilization of stations.
Surrey LRT Optimal Station Locations
Over the next five to ten years, the City of Surrey is planning to build a Light Rail Transit (LRT)system comprised of two routes. The first route begins at Newton Exchange along King GeorgeBoulevard and continues to 104 Ave where it makes a right turn and terminates at 152 Street. Thesecond route begins at King George Station and continues along Fraser Hwy until it terminates atLangley Centre. One of the key decisions that must be made before construction of the Fraser Hwy route is theplacement of the transit stops. Placing stops requires balancing convenience, utilization, and costs.If too few stops are built, fewer people may use transit and some the bene1ts may not be fully realized. On the other hand, if too many stops are built, using the system may be more convenientfor more people but there will be the risk that some stops are underused and, therefore, the costof building and operating that particular stop may exceed the expected benefits.In this paper, we use linear programming methods to determine the most efficient placementof transit stops along Fraser Hwy from King George Station to Langley Centre. The goal will beto minimize costs while extracting as much bene1t as possible by balancing convenience andutilization of stations.
Surrey LRT Optimal Station Locations
Jace, Shane (Autor:in) / Wong, Melvin (Autor:in) / Xu, Daisy (Autor:in) / Zita, Aren (Autor:in)
25.07.2019
Analytics Now; Analytics Now 2017-2018 Edition; 45-64
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
DDC:
720
UB Braunschweig | 1971
|Online Contents | 2002
British Library Online Contents | 1992
Crowdsourcing Bike Share Station Locations
Taylor & Francis Verlag | 2019
|British Library Online Contents | 2003
|