Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
A Full-Scale Test of Coping-Girder Integrated Bridge
Recently, a new continuous bridge system has been proposed to increase the space under the bridge and to improve aesthetic aspect of the urban area. The main feature of the proposed bridge is to connect steel I-girders and coping by means of prestressed high-strength steel bars and steel plate. The proposed bridge is able to lower the height of the bridge to ensure the workability and efficiency through a reduction of the cost of road construction. This study presents the experimental result of the full-scale connection between steel I-girders and coping under the negative bending moment. The composite behavior is thoroughly examined and discussed under the specific load levels such as service load, factored load and crack load. Structural response showed full composite action until the final load level because no relative displacement between coping and girder was observed. It was also found prestressing force into high-strength bars was able to control tensile stresses of deck slab. This indicated that cracks in deck slab can be controlled by above-mentioned prestressing force.
A Full-Scale Test of Coping-Girder Integrated Bridge
Recently, a new continuous bridge system has been proposed to increase the space under the bridge and to improve aesthetic aspect of the urban area. The main feature of the proposed bridge is to connect steel I-girders and coping by means of prestressed high-strength steel bars and steel plate. The proposed bridge is able to lower the height of the bridge to ensure the workability and efficiency through a reduction of the cost of road construction. This study presents the experimental result of the full-scale connection between steel I-girders and coping under the negative bending moment. The composite behavior is thoroughly examined and discussed under the specific load levels such as service load, factored load and crack load. Structural response showed full composite action until the final load level because no relative displacement between coping and girder was observed. It was also found prestressing force into high-strength bars was able to control tensile stresses of deck slab. This indicated that cracks in deck slab can be controlled by above-mentioned prestressing force.
A Full-Scale Test of Coping-Girder Integrated Bridge
Heeyoung Lee (Autor:in) / Woosung Bin (Autor:in) / Kangseog Seo (Autor:in) / Hyojeong Yun (Autor:in) / Zuog An (Autor:in)
25.08.2014
oai:zenodo.org:2660159
International Journal of Civil and Environmental Engineering 8.0(8)
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
DDC:
690
Full scale test on a bridge PC box girder
British Library Conference Proceedings | 2010
|Full-Scale Model Test of Prestressed Segmental Precast Continuous Girder Bridge
Springer Verlag | 2017
|Full-Scale Test and Analysis of a Curved Steel-Box Girder Bridge
British Library Online Contents | 2008
|Full-Scale Test and Analysis of a Curved Steel-Box Girder Bridge
Online Contents | 2008
|Construction method of bridge using girder with integral coping
Europäisches Patentamt | 2016
|