Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Rehabilitation and seismic upgrading of the masonry arch bridge over the Magra river in Villafranca
The paper deals with the rehabilitation of an historical masonry bridge crossing the Magra river and connecting the small towns of Mulazzo and Villafranca in the northern part of Tuscany (I).The masonry arch bridge, characterized by eight arches spanning 19 m around each and by around 12 m height intermediate masonry piers on shallow foundations, was built in 1874. Since the original carriageway width was not sufficient to allow two lanes, in 1961 it was widened by means of two lateral prestressed concrete beams, supported by the piers, so hiding the arches and modifying severely the original aspect of the bridge itself. In 2011, during the Magra flooding, two arches on the Mulazzo side collapsed due to scour of the extreme pier. The reconstruction the collapsed arches and rehabilitation and the strengthening of the bridge, which has been completed last year, is discussed and the execution of the interventions, which has performed without erection of temporary support in the riverbed, is also illustrated. Particular attention is devoted to the original solutions which have been adopted for the full seismic upgrading of the bridge according to the Italian Building Code currently in force, recovering the original architectural aspect of the bridge and widening the carriageway as well.
Rehabilitation and seismic upgrading of the masonry arch bridge over the Magra river in Villafranca
The paper deals with the rehabilitation of an historical masonry bridge crossing the Magra river and connecting the small towns of Mulazzo and Villafranca in the northern part of Tuscany (I).The masonry arch bridge, characterized by eight arches spanning 19 m around each and by around 12 m height intermediate masonry piers on shallow foundations, was built in 1874. Since the original carriageway width was not sufficient to allow two lanes, in 1961 it was widened by means of two lateral prestressed concrete beams, supported by the piers, so hiding the arches and modifying severely the original aspect of the bridge itself. In 2011, during the Magra flooding, two arches on the Mulazzo side collapsed due to scour of the extreme pier. The reconstruction the collapsed arches and rehabilitation and the strengthening of the bridge, which has been completed last year, is discussed and the execution of the interventions, which has performed without erection of temporary support in the riverbed, is also illustrated. Particular attention is devoted to the original solutions which have been adopted for the full seismic upgrading of the bridge according to the Italian Building Code currently in force, recovering the original architectural aspect of the bridge and widening the carriageway as well.
Rehabilitation and seismic upgrading of the masonry arch bridge over the Magra river in Villafranca
Croce, Nicola (Autor:in) / Croce, Pietro (Autor:in) / Pelusi, Marino (Autor:in) / Taccola, Raffaele (Autor:in) / Croce, Nicola / Croce, Pietro / Pelusi, Marino / Taccola, Raffaele
01.01.2018
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
DDC:
720
Rehabilitation and Strengthening of a Masonry Arch Bridge
British Library Conference Proceedings | 2002
|The masonry arch bridge over the Isonzo river at Salcano
Engineering Index Backfile | 1909
|Engineering Index Backfile | 1895
IBC 23-49: Accelerated Rehabilitation of a Masonry Arch Bridge
TIBKAT | 2023
|Rehabilitation of Masonry Arch Bridges
British Library Conference Proceedings | 2010
|