Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Sewer Culvert Installation Method to Accommodate Underground Construction in an Urban Area with Narrow Streets
In recent years, a reconstruction project for sewer pipelines has been progressing in Japan with the aim of renewing old sewer culverts. However, it is difficult to secure a sufficient base area for shafts in an urban area because many streets are narrow with a complex layout. As a result, construction in such urban areas is generally very demanding. In urban areas, there is a strong requirement for a safe, reliable and economical construction method that does not disturb the public's daily life and urban activities. With this in mind, we developed a new construction method called the 'shield switching type micro-tunneling method' which integrates the micro-tunneling method and shield method. In this method, pipeline is constructed first for sections that are gently curved or straight using the economical micro-tunneling method, and then the method is switched to the shield method for sections with a sharp curve or a series of curves without establishing an intermediate shaft. This paper provides the information, features and construction examples of this newly developed method.
Sewer Culvert Installation Method to Accommodate Underground Construction in an Urban Area with Narrow Streets
In recent years, a reconstruction project for sewer pipelines has been progressing in Japan with the aim of renewing old sewer culverts. However, it is difficult to secure a sufficient base area for shafts in an urban area because many streets are narrow with a complex layout. As a result, construction in such urban areas is generally very demanding. In urban areas, there is a strong requirement for a safe, reliable and economical construction method that does not disturb the public's daily life and urban activities. With this in mind, we developed a new construction method called the 'shield switching type micro-tunneling method' which integrates the micro-tunneling method and shield method. In this method, pipeline is constructed first for sections that are gently curved or straight using the economical micro-tunneling method, and then the method is switched to the shield method for sections with a sharp curve or a series of curves without establishing an intermediate shaft. This paper provides the information, features and construction examples of this newly developed method.
Sewer Culvert Installation Method to Accommodate Underground Construction in an Urban Area with Narrow Streets
Osamu Igawa (Autor:in) / Hiroshi Kouchiwa (Autor:in) / Yuji Ito (Autor:in)
14.01.2014
oai:zenodo.org:2658326
International Journal of Civil and Environmental Engineering 8.0(1)
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
DDC:
690
Urban drainage underground culvert sedimentation tank construction method
Europäisches Patentamt | 2020
|Restoring streets after sewer construction
Engineering Index Backfile | 1942
|