Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Coordination of Wind Power and Hydro Power ; Koordinering av vind- och vattenkraft
The goal of this project was to calculate how much wind power could be balanced with hydro power in our designated area consisting of five hydro power stations, four villages which consume power, possible locations for wind power and one connection to the national grid. To achieve this a simulation model was constructed in the GAMS software with the goal of achieving the maximum profit from the hydro power plants by considering electricity prices, inflow of water, the physical construction of the power plants and the time of year. When this was achieved, restriction for the maximum transmission load on the power grid was added as well as local wind power production as to simulate the implementation of new power sources on an old system and power grid. This would result in a maximum income in SEK as well as the most wind power which could be maintained and balanced by the designated system. This project shows how to find the optimal way to use hydro power and wind power as well as how the integration between different sources of electricity production could work, which is vital for a future powered by renewable energy and will help towards lowering emissions.
Coordination of Wind Power and Hydro Power ; Koordinering av vind- och vattenkraft
The goal of this project was to calculate how much wind power could be balanced with hydro power in our designated area consisting of five hydro power stations, four villages which consume power, possible locations for wind power and one connection to the national grid. To achieve this a simulation model was constructed in the GAMS software with the goal of achieving the maximum profit from the hydro power plants by considering electricity prices, inflow of water, the physical construction of the power plants and the time of year. When this was achieved, restriction for the maximum transmission load on the power grid was added as well as local wind power production as to simulate the implementation of new power sources on an old system and power grid. This would result in a maximum income in SEK as well as the most wind power which could be maintained and balanced by the designated system. This project shows how to find the optimal way to use hydro power and wind power as well as how the integration between different sources of electricity production could work, which is vital for a future powered by renewable energy and will help towards lowering emissions.
Coordination of Wind Power and Hydro Power ; Koordinering av vind- och vattenkraft
Solhall, Axel (Autor:in) / Guéry, Edvin (Autor:in)
01.01.2017
Hochschulschrift
Elektronische Ressource
Englisch
DDC:
690
Sa vind, hoest storm! Kommentar
British Library Online Contents | 1998
|An integrated approach for optimal coordination of wind power and hydro pumping storage
BASE | 2014
|ONDERNEMER - Leerlingbouw - Oude knarren vind je bij Salverda alleen in de staf
Online Contents | 2004
Vind de verschillen - Iedereen neemt op zijn eigen wijze situaties waar.
Online Contents | 2009
|