Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Dviejų aukštų gyvenamojo namo su garažu Šiaulių mieste statybos projektas / ; Two-storey residential house with a garage in Siauliai construction project.
Projected individual residential building in the city of Siauliai. The building is designed for a family of 4. Designed a two-storey house with 15 different rooms, with a total area of 225m2. With the help of new IZODOM 2000 Structural solutions built passive energy saving in buildings corresponding to the A ++ energy efficiency class. Such results were achieved using residual formwork made of Neopor and periporo. These blocks have special links with each other, which helps to ensure tightness and absence of cold bridges. Easy mounting blocks technology and easy installation of the foundation slab effectively and quickly to carry out construction work. Build speed and efficient work is a very important factor. To realize the project there was prepared architectural drawings, the main nodes, as well as prepared masonry technology. Which make up the narrative and drawings necessary mechanisms for the movement scheme. Perform the amount of work and materials and basic mechanisms of demand calculations. Description of the main construction site rules and safety requirements. The building construction cost is EUR 173483,75.
Dviejų aukštų gyvenamojo namo su garažu Šiaulių mieste statybos projektas / ; Two-storey residential house with a garage in Siauliai construction project.
Projected individual residential building in the city of Siauliai. The building is designed for a family of 4. Designed a two-storey house with 15 different rooms, with a total area of 225m2. With the help of new IZODOM 2000 Structural solutions built passive energy saving in buildings corresponding to the A ++ energy efficiency class. Such results were achieved using residual formwork made of Neopor and periporo. These blocks have special links with each other, which helps to ensure tightness and absence of cold bridges. Easy mounting blocks technology and easy installation of the foundation slab effectively and quickly to carry out construction work. Build speed and efficient work is a very important factor. To realize the project there was prepared architectural drawings, the main nodes, as well as prepared masonry technology. Which make up the narrative and drawings necessary mechanisms for the movement scheme. Perform the amount of work and materials and basic mechanisms of demand calculations. Description of the main construction site rules and safety requirements. The building construction cost is EUR 173483,75.
Dviejų aukštų gyvenamojo namo su garažu Šiaulių mieste statybos projektas / ; Two-storey residential house with a garage in Siauliai construction project.
Bražėnas, Lukas (Autor:in) / Mockienė, Edita
01.01.2017
Hochschulschrift
Elektronische Ressource
Lithuanian , Englisch