Understanding cost escalation in nuclear reactor construction projects
This work seeks to evaluate overnight construction costs (OCC) and lead time escalation of nuclear reactors from 1955 to 2016. To this end, a comprehensive database of commercial Light Water Reactors (LWR) was developed and a statistical analysis was conducted. Findings reveal that there is significant delay in lead time, especially for the last generation reactors constructed from 2010’s. This results in the escalation of capital costs rather than a decline. Average OCC of newer reactors are 60% higher than the ones implemented in the earlier stages of the nuclear era. This suggests a negative learning curve effect for both OCC and lead time, which threats the market and financial sustainability of current and future nuclear energy projects. Although this is a general trend, this negative effect is country specific and, thus, induced by national policies and regulatory frameworks. Therefore, the role of nuclear technology to cope with the decarbonisation of the power sector must be better evaluated, taking into account the real cost impacts of nuclear technology implementation. ; This work was also funded by the Brazilian research funding agency CNPq. ; This work was funded by the Brazilian research funding agency CNPq and the Marie Curie International Research Staff Exchange Scheme Fellowship within the 7th European Union Framework Programme, under the project NETEP- European Brazilian Network on Energy Planning (PIRSES-GA-2013-612263).
Understanding cost escalation in nuclear reactor construction projects
This work seeks to evaluate overnight construction costs (OCC) and lead time escalation of nuclear reactors from 1955 to 2016. To this end, a comprehensive database of commercial Light Water Reactors (LWR) was developed and a statistical analysis was conducted. Findings reveal that there is significant delay in lead time, especially for the last generation reactors constructed from 2010’s. This results in the escalation of capital costs rather than a decline. Average OCC of newer reactors are 60% higher than the ones implemented in the earlier stages of the nuclear era. This suggests a negative learning curve effect for both OCC and lead time, which threats the market and financial sustainability of current and future nuclear energy projects. Although this is a general trend, this negative effect is country specific and, thus, induced by national policies and regulatory frameworks. Therefore, the role of nuclear technology to cope with the decarbonisation of the power sector must be better evaluated, taking into account the real cost impacts of nuclear technology implementation. ; This work was also funded by the Brazilian research funding agency CNPq. ; This work was funded by the Brazilian research funding agency CNPq and the Marie Curie International Research Staff Exchange Scheme Fellowship within the 7th European Union Framework Programme, under the project NETEP- European Brazilian Network on Energy Planning (PIRSES-GA-2013-612263).
Understanding cost escalation in nuclear reactor construction projects
Portugal-Pereira, Joana (Autor:in) / Ferreira, Paula M. T. (Autor:in) / Cunha, Jorge (Autor:in) / Szklo, Alexandre (Autor:in) / Schaeffer, Roberto (Autor:in) / Araújo, Maria Madalena Teixeira de (Autor:in)
16.06.2016
Aufsatz (Konferenz)
Elektronische Ressource
Englisch
DDC:
690
Modeling Cost Escalation as a Risk Factor in Construction Projects
British Library Conference Proceedings | 2005
|Forecasting construction cost escalation
Online Contents | 1993
|Modeling Cost Escalation in Large Infrastructure Projects
Online Contents | 2006
|Modeling Cost Escalation in Large Infrastructure Projects
British Library Online Contents | 2006
|Construction Project Cost Escalation Factors
Online Contents | 2009
|