Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Project cost study in site management-Finland vs Vietnam
The success of a project and its effectiveness is decided by how well the project cost has been handled. There are high fluctuations of costs during the implementation of a building project which have a strong influence on the overall investment figure as well as on the progress of the whole development. The purpose of this thesis is to study in depth the definition, content, roles of the project costs as well as the factors influencing it. The thesis is practice –based. For studying the project costs in Vietnam a case study was selected, a pharmacy located on 87 Tran Cung street in Ha Noi, along with professional’s expertise, in this case, the director of Vitexco. The project costs in Finland are evaluated using Talo90, the Finnish cost estimation system. Factors influencing the expenses of the project such as human resources, design, risk, material, etc. are elaborated in the thesis for determining how these factors make an alteration to the project costs. Additionally, a comparison between the cost estimation systems between the two countries are examined further to see which system would be more optimal and see the strengths and weaknesses in each of them. The thesis also has two Appendices showing the process of obtaining a building permint in Vietnam and Finland.
Project cost study in site management-Finland vs Vietnam
The success of a project and its effectiveness is decided by how well the project cost has been handled. There are high fluctuations of costs during the implementation of a building project which have a strong influence on the overall investment figure as well as on the progress of the whole development. The purpose of this thesis is to study in depth the definition, content, roles of the project costs as well as the factors influencing it. The thesis is practice –based. For studying the project costs in Vietnam a case study was selected, a pharmacy located on 87 Tran Cung street in Ha Noi, along with professional’s expertise, in this case, the director of Vitexco. The project costs in Finland are evaluated using Talo90, the Finnish cost estimation system. Factors influencing the expenses of the project such as human resources, design, risk, material, etc. are elaborated in the thesis for determining how these factors make an alteration to the project costs. Additionally, a comparison between the cost estimation systems between the two countries are examined further to see which system would be more optimal and see the strengths and weaknesses in each of them. The thesis also has two Appendices showing the process of obtaining a building permint in Vietnam and Finland.
Project cost study in site management-Finland vs Vietnam
Nguyen, Hoang (Autor:in)
01.01.2021
Sonstige
Elektronische Ressource
Englisch
DDC:
690
PROJECT MANAGEMENT - On-site cost efficiency.
Online Contents | 1998
Cost efficiency in international multi-site engagements : Case: Capgemini Finland Ltd
BASE | 2010
|Evaluating impact of waste factors on project performance cost in Vietnam
Springer Verlag | 2014
|Evaluating impact of waste factors on project performance cost in Vietnam
Online Contents | 2014
|Transportation Project Evaluation in Vietnam
British Library Online Contents | 1994
|