Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Perbandingan Desain Dermaga Terapung Pada Sistem Konstruksi Melintang dan Memanjang
Floating port is a barge made of rectangular steel or concrete that can float to adjust the water lavel. Barge is a cargo ship type do not have a propulsion system. So, design of floating port preferably aqual to ship design. There are 3 types of barge construction system, that are longitudinal system, transversal system and mixed construction. To get the optimal design of floating port, comparison of design based on the construction system is needed. Case study in this research ia a Tideng Pale-KTT floating port. Deformation and stress analysis using FEA method on 2 models of construction system, that are transversal and longitudinal. Based on results, both of construction system produce a good strength value. However, there are some construction component which does not match the placement of the construction system. Results of construction costs have 5,51% deviation, longitudinal sytem is more expensive. So, produce the hypotheses to do a combination for both of construction systems.
Perbandingan Desain Dermaga Terapung Pada Sistem Konstruksi Melintang dan Memanjang
Floating port is a barge made of rectangular steel or concrete that can float to adjust the water lavel. Barge is a cargo ship type do not have a propulsion system. So, design of floating port preferably aqual to ship design. There are 3 types of barge construction system, that are longitudinal system, transversal system and mixed construction. To get the optimal design of floating port, comparison of design based on the construction system is needed. Case study in this research ia a Tideng Pale-KTT floating port. Deformation and stress analysis using FEA method on 2 models of construction system, that are transversal and longitudinal. Based on results, both of construction system produce a good strength value. However, there are some construction component which does not match the placement of the construction system. Results of construction costs have 5,51% deviation, longitudinal sytem is more expensive. So, produce the hypotheses to do a combination for both of construction systems.
Perbandingan Desain Dermaga Terapung Pada Sistem Konstruksi Melintang dan Memanjang
Utomo, Edy (Autor:in)
30.08.2018
BORNEO ENGINEERING : Jurnal Teknik Sipil; Vol 2 No 1: Juni 2018; 1-13 ; 2581-1134
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
DDC:
690
Perbandingan Metode Konstruksi Plat Lantai Sistem Double Wire Mesh Dengan Sistem Half Slab
DOAJ | 2013
|Perbandingan Karakteristik Manajemen Risiko Konstruksi Pada Kontraktor Bumn Dan Swasta
DOAJ | 2020
|Sistem Pengukuran Kinerja Supply Chain Management Pada Proyek Konstruksi
BASE | 2019
|SISTEM PELESAPAN PADA KONSTRUKSI KOORDINATIF BAHASA SUMBA DIALEK WAIJEWA
DOAJ | 2015
|