Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
ANALISIS PENERAPAN K3 PADA PROYEK KONSTRUKSI DI MASA PANDEMI COVID-19
The impact of the COVID-19 pandemic that has spread throughout the world has had a significant impact on theconstruction sector. For this reason, serious efforts are needed from all construction stakeholders so thatoccupational safety and health (K3) is implemented in all construction projects. In connection with the CoronaVirus Disease 2019 (Covid-19) pandemic. The purpose of this study is to determine the optimal strategy forincreasing the application of K3. The type of research used is combination research is a research method thatcombines quantitative methods and qualitative methods. Data analysis was carried out with SWOT analysis to helpformulate the right strategy to improve construction implementation during the COVID-19 pandemic. The results ofthe SWOT matrix analysis of internal factors and external factors that affect the implementation of K3L during theCOVID-19 pandemic obtained a Strength score of 2.95, Opportunity Score of 2.40, Weakness Score of 1.24, and ThreatScore of 1.60. So based on the calculation of internal factors and external factors, as well as a Cartesian diagram the company's condition is in quadrant I, namely S-O (Strength-Opportunities) where this situation is asituation where the company uses strength to take advantage of existing opportunities. Meanwhile, the optimalstrategy to increase the application of K3 during the COVID-19 pandemic is the Aggressive Strategy.
ANALISIS PENERAPAN K3 PADA PROYEK KONSTRUKSI DI MASA PANDEMI COVID-19
The impact of the COVID-19 pandemic that has spread throughout the world has had a significant impact on theconstruction sector. For this reason, serious efforts are needed from all construction stakeholders so thatoccupational safety and health (K3) is implemented in all construction projects. In connection with the CoronaVirus Disease 2019 (Covid-19) pandemic. The purpose of this study is to determine the optimal strategy forincreasing the application of K3. The type of research used is combination research is a research method thatcombines quantitative methods and qualitative methods. Data analysis was carried out with SWOT analysis to helpformulate the right strategy to improve construction implementation during the COVID-19 pandemic. The results ofthe SWOT matrix analysis of internal factors and external factors that affect the implementation of K3L during theCOVID-19 pandemic obtained a Strength score of 2.95, Opportunity Score of 2.40, Weakness Score of 1.24, and ThreatScore of 1.60. So based on the calculation of internal factors and external factors, as well as a Cartesian diagram the company's condition is in quadrant I, namely S-O (Strength-Opportunities) where this situation is asituation where the company uses strength to take advantage of existing opportunities. Meanwhile, the optimalstrategy to increase the application of K3 during the COVID-19 pandemic is the Aggressive Strategy.
ANALISIS PENERAPAN K3 PADA PROYEK KONSTRUKSI DI MASA PANDEMI COVID-19
Wijaya, I Made Harta (Autor:in) / Putra, Cokorda (Autor:in) / Riskiana, I Kadek Agus (Autor:in)
30.10.2023
doi:10.32795/widyateknik.v19i1.4479
Widya Teknik; Vol 19 No 1 (2023): Widya Teknik; 35-46 ; 3026-5363 ; 10.32795/widyateknik.v19i1
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
DDC:
690
Analisis Faktor Tenaga Kerja pada Produktivitas Proyek Konstruksi di Masa Pandemi
DOAJ | 2023
|Evaluasi Penerapan Constructability pada Proyek Konstruksi Bangunan Gedung
DOAJ | 2015
|Analisis Faktor-Faktor Penyebab Kendala Triple Constraint Proyek Konstruksi Akibat Pandemi Covid-19
DOAJ | 2021
|BASE | 2022
|