Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Išmaniųjų technologijų taikymas statybos proceso valdymui ; Use of Smart Technologies for Building Process Management
The main goal of master‘s thesis is to identify the benefits of smart technologies for the construction process. Master’s thesis consists of three main parts. In the first part the information of smart technologies for construction project implementation stages was collected. The second part of master's thesis presents the research model, reviews the multicriteria methods, and selects the evaluation indicators. The third part of the thesis includes the research on the benefits of smart technologies, their usage and compatibility possibilities under the implementation of construction project. Smart technologies are divided into three different groups of activities are compared against the set indicators. Generalized results are presented as conclusions. The references and appendixes are included in the end of the thesis. Thesis consists of 70 pages of text, 21 illustrations, 36 tables. Appendixes are attached separately.
Išmaniųjų technologijų taikymas statybos proceso valdymui ; Use of Smart Technologies for Building Process Management
The main goal of master‘s thesis is to identify the benefits of smart technologies for the construction process. Master’s thesis consists of three main parts. In the first part the information of smart technologies for construction project implementation stages was collected. The second part of master's thesis presents the research model, reviews the multicriteria methods, and selects the evaluation indicators. The third part of the thesis includes the research on the benefits of smart technologies, their usage and compatibility possibilities under the implementation of construction project. Smart technologies are divided into three different groups of activities are compared against the set indicators. Generalized results are presented as conclusions. The references and appendixes are included in the end of the thesis. Thesis consists of 70 pages of text, 21 illustrations, 36 tables. Appendixes are attached separately.
Išmaniųjų technologijų taikymas statybos proceso valdymui ; Use of Smart Technologies for Building Process Management
Čepulytė, Karolina (Autor:in) / Vilutienė, Tatjana
13.06.2019
Hochschulschrift
Elektronische Ressource
Lithuanian , Englisch
DDC:
690