Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Failures and Defects in the Building Process:Applying the Bow-Tie Approach
Function failures, defects, mistakes and poor communication are major problems for the construction sector. As the empirical element in the research, a large construction site was observed from the very start to the very end and all failures and defects of a certain size were recorded and analysed. The methodological approach used in this analysis was the bow-tie model from the area of safety research. It combines critical-event analysis for both causes and effects with event-tree analysis. Analysing the many critical events in the building process with the bow-tie model visualises the complexity of causes. This visualisation offers the possibility for a much more direct and focused discussion of what needs doing, by whom and when – not only to avoid the number of defects in the final product, but also to make the building process flow much better and reduce the need for damage control.
Failures and Defects in the Building Process:Applying the Bow-Tie Approach
Function failures, defects, mistakes and poor communication are major problems for the construction sector. As the empirical element in the research, a large construction site was observed from the very start to the very end and all failures and defects of a certain size were recorded and analysed. The methodological approach used in this analysis was the bow-tie model from the area of safety research. It combines critical-event analysis for both causes and effects with event-tree analysis. Analysing the many critical events in the building process with the bow-tie model visualises the complexity of causes. This visualisation offers the possibility for a much more direct and focused discussion of what needs doing, by whom and when – not only to avoid the number of defects in the final product, but also to make the building process flow much better and reduce the need for damage control.
Failures and Defects in the Building Process:Applying the Bow-Tie Approach
Jørgensen, Kirsten (Autor:in)
01.01.2009
Jørgensen , K 2009 , Failures and Defects in the Building Process : Applying the Bow-Tie Approach . in Construction Facing Worldwide Challenges . CIB , Dubrovnik , pp. 19-20 , Joint International Symposium : WO65 & WO55 , 01/01/2009 .
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
DDC:
690
Building Defects or Building Failures: Misconception and Understanding
Trans Tech Publications | 2015
|Building Defects or Building Failures: Misconception and Understanding
British Library Conference Proceedings | 2015
|FAILURES AND DEFECTS IN THE BUILDING PROCESS – APPLYING THE BOW-TIE APPROACH
BASE | 2009
|Understanding building failures
TIBKAT | 2007
|