ROBUST SCHEDULING IN CONSTRUCTION ENGINEERING
In construction engineering, a schedule’s input data, which is usually not exactly known in the planning phase, is considered deterministic when generating the schedule. As a result, construction schedules become unreliable and deadlines are often not met. While the optimization of construction schedules with respect to costs and makespan has been a matter of research in the past decades, the optimization of the robustness of construction schedules has received little attention. In this paper, the effects of uncertainties inherent to the input data of construction schedules are discussed. Possibilities are investigated to improve the reliability of construction schedules by considering alternative processes for certain tasks and by identifying the combination of processes generating the most robust schedule with respect to the makespan of a construction project.
ROBUST SCHEDULING IN CONSTRUCTION ENGINEERING
In construction engineering, a schedule’s input data, which is usually not exactly known in the planning phase, is considered deterministic when generating the schedule. As a result, construction schedules become unreliable and deadlines are often not met. While the optimization of construction schedules with respect to costs and makespan has been a matter of research in the past decades, the optimization of the robustness of construction schedules has received little attention. In this paper, the effects of uncertainties inherent to the input data of construction schedules are discussed. Possibilities are investigated to improve the reliability of construction schedules by considering alternative processes for certain tasks and by identifying the combination of processes generating the most robust schedule with respect to the makespan of a construction project.
ROBUST SCHEDULING IN CONSTRUCTION ENGINEERING
Hartmann, Veronika (Autor:in) / Smarsly, Kay (Autor:in) / Lahmer, Tom (Autor:in) / Gürlebeck, Klaus / Lahmer, Tom
28.08.2015
Aufsatz (Konferenz)
Elektronische Ressource
Englisch
Robust Construction Scheduling Using Discrete-Event Simulation
British Library Conference Proceedings | 2011
|Construction engineering - Construction project scheduling by ranked positional weight method
Online Contents | 1998
|Bi-objective Optimization for Resource-constrained Robust Construction Project Scheduling
Springer Verlag | 2024
|