Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Risk Assessment and the Environmental Impact of Industrial Projects in Malaysia: A case study of SAMUR, Sabah
To ensure high performance of projects, risk factors and their impact towards the environment need to be addressed during and after the construction phase. This research aims to assess the risk factors and the impact of industrial projects to the environment and surrounding areas. The research employs multi-method strategies: this case study includes several interviews, observations, analysis of project documents and questionnaires distributed among the occupants living in the surrounding area. The results of the research indicated that the project is perceived to have negative environmental impact measured under ecosystem, natural resources, and public impact.Keywords: risk assessment, risk factors, environmental impact, industrial projects, MalaysiaISSN: 2398-4287© 2017. The Authors. Published for AMER ABRA by e-International Publishing House, Ltd., UK. This is an open access article under the CC BYNC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/). Peer–review under responsibility of AMER (Association of Malaysian Environment-Behaviour Researchers), ABRA (Association of Behavioural Researchers on Asians) and cE-Bs (Centre for Environment-Behaviour Studies), Faculty of Architecture, Planning & Surveying, Universiti Teknologi MARA, Malaysia.
Risk Assessment and the Environmental Impact of Industrial Projects in Malaysia: A case study of SAMUR, Sabah
To ensure high performance of projects, risk factors and their impact towards the environment need to be addressed during and after the construction phase. This research aims to assess the risk factors and the impact of industrial projects to the environment and surrounding areas. The research employs multi-method strategies: this case study includes several interviews, observations, analysis of project documents and questionnaires distributed among the occupants living in the surrounding area. The results of the research indicated that the project is perceived to have negative environmental impact measured under ecosystem, natural resources, and public impact.Keywords: risk assessment, risk factors, environmental impact, industrial projects, MalaysiaISSN: 2398-4287© 2017. The Authors. Published for AMER ABRA by e-International Publishing House, Ltd., UK. This is an open access article under the CC BYNC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/). Peer–review under responsibility of AMER (Association of Malaysian Environment-Behaviour Researchers), ABRA (Association of Behavioural Researchers on Asians) and cE-Bs (Centre for Environment-Behaviour Studies), Faculty of Architecture, Planning & Surveying, Universiti Teknologi MARA, Malaysia.
Risk Assessment and the Environmental Impact of Industrial Projects in Malaysia: A case study of SAMUR, Sabah
Marmaya, Ezyana Anyzah (Autor:in) / Mahbub, Rohana (Autor:in)
18.03.2017
doi:10.21834/e-bpj.v2i5.618
Environment-Behaviour Proceedings Journal; Vol. 2 No. 5 (2017): March. ASLI QoL2017. AicQoL2017Bangkok, 25-27 February 2017; 507-519 ; 2398-4287 ; 10.21834/e-bpj.v2i5
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Incentives for forestry plantation projects in Sabah, Malaysia
British Library Online Contents | 2000
|Flood Risk Assessment on Selected Critical Infrastructure in Kota Marudu Town, Sabah, Malaysia
DOAJ | 2017
|Investigations for the Tawau Dam, Sabah, Malaysia
British Library Conference Proceedings | 1994
|Rural Land Development and Resettlement in Sabah, Malaysia
Wiley | 1977
|Evaluation of Environmental Impact and Risk Assessment Methods of Industrial Buildings in Malaysia
BASE | 2018
|