Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Challenges negating virtual construction project team performance in the Middle East
Purpose Over the last couple of decades, many organisations are increasingly adopting virtual team concepts, and construction companies in the Middle East are no exception. Members of a virtual team are geographically scattered and represent diverse cultures. Thus, challenging issues emerge more frequently than in a traditional team. There are challenges associated with space and time as well as high client’s demand. Therefore, this study aims to identify and probe the causes of the challenges in virtual project teams in the construction industry of the Middle East. Design/methodology/approach A list of challenges was derived through a comprehensive review of relevant literature. Questionnaire survey was conducted with professionals who are involved in construction virtual project teams. Further, the factor analysis technique was used to analyse the survey responses. Findings Results show that the challenges in virtual team arrangement in the Middle East construction industry can be grouped into seven categories, namely: organisational culture, conflict within the team, characteristics of the team members, trust within the team members diversity of the team, communication and training, and cohesion in the team. Understanding of these factors will drive the needed platform to support effective virtual project teams in the Middle East. Originality/value This study raises the prospect that organisations may establish an environment for team members to achieve higher levels of virtual cooperation by concentrating on these potentially crucial factors. This, in turn, will encourage further innovation and performance within construction organisations.
Challenges negating virtual construction project team performance in the Middle East
Purpose Over the last couple of decades, many organisations are increasingly adopting virtual team concepts, and construction companies in the Middle East are no exception. Members of a virtual team are geographically scattered and represent diverse cultures. Thus, challenging issues emerge more frequently than in a traditional team. There are challenges associated with space and time as well as high client’s demand. Therefore, this study aims to identify and probe the causes of the challenges in virtual project teams in the construction industry of the Middle East. Design/methodology/approach A list of challenges was derived through a comprehensive review of relevant literature. Questionnaire survey was conducted with professionals who are involved in construction virtual project teams. Further, the factor analysis technique was used to analyse the survey responses. Findings Results show that the challenges in virtual team arrangement in the Middle East construction industry can be grouped into seven categories, namely: organisational culture, conflict within the team, characteristics of the team members, trust within the team members diversity of the team, communication and training, and cohesion in the team. Understanding of these factors will drive the needed platform to support effective virtual project teams in the Middle East. Originality/value This study raises the prospect that organisations may establish an environment for team members to achieve higher levels of virtual cooperation by concentrating on these potentially crucial factors. This, in turn, will encourage further innovation and performance within construction organisations.
Challenges negating virtual construction project team performance in the Middle East
Sagar, Sukhwant (Autor:in) / Oladinrin, Olugbenga (Autor:in) / Arif, Mohammed (Autor:in) / Rana, Muhammad (Autor:in)
25.01.2022
Sagar , S , Oladinrin , O , Arif , M & Rana , M 2022 , ' Challenges negating virtual construction project team performance in the Middle East ' , Built Environment Project and Asset Management , vol. 12 , no. 4 , pp. 613-629 . https://doi.org/10.1108/BEPAM-08-2021-0104
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
NEGATING NOISE: NEW GUIDELINES IMPACT SOUND CONTROL
British Library Online Contents | 2009
|Telepresence in Virtual Construction Project Team Communications
British Library Conference Proceedings | 1997
|Foundations - Middle East Challenges
British Library Conference Proceedings | 2009
|A novel controller to increase harvested energy from negating vibration-suppression effect
British Library Online Contents | 2015
|A competency model for project construction team and project control team
Springer Verlag | 2011
|