Perencanaan Pondasi Borepile Pada Jembatan, Studi Kasus : Jembatan Utama Cisadane
The most important part in a bridge construction is the foundation. Bore pile foundation is planned for 2 abutments and 5 piers. The entire foundation uses a diameter of 1 meter with a depth of 20-30 meters. Calculation of axial bearing capacity using the reese and wright method produces a single pile axial bearing capacity of 268.090 - 470.697 tons. The efficiency of the pile group using the Converse-Labarre method and the axial bearing capacity of the pile group is 5870,246 - 33176,233 tons. Single pile settlement using a semi-empirical method and resulted in a decrease of 50,100 - 59,490 mm. The settlement of the pile group used the vesic method and resulted in a decrease of 6,627 - 13,302 cm. consolidation decrease using the coefficient of volume change and resulted in a decrease of 104,024-576.047 mm with a time of 5,694-26,731 years. The calculation of lateral bearing capacity and pile deflection using the Broms method resulted in the lateral bearing capacity of the pile group of 3024-20580 tons and deflection of 1.485-5.888 mm. foundation reinforcement using the reference of SNI 2847-2019. Longitudinal reinforcement using 10D32 and stirrup reinforcement D16-50 and D16-75. Pile cap planning refers to SNI 2847-2019, resulting in a pile cap thickness of 1.5-4 meters. The X direction and Y direction reinforcement used are D32-150 for the pier and D32-150 and D25-150 for the abutment. The calculation of the cost budget plan uses the unit price analysis method and the resulting total cost is 73.574.031.053.
Perencanaan Pondasi Borepile Pada Jembatan, Studi Kasus : Jembatan Utama Cisadane
The most important part in a bridge construction is the foundation. Bore pile foundation is planned for 2 abutments and 5 piers. The entire foundation uses a diameter of 1 meter with a depth of 20-30 meters. Calculation of axial bearing capacity using the reese and wright method produces a single pile axial bearing capacity of 268.090 - 470.697 tons. The efficiency of the pile group using the Converse-Labarre method and the axial bearing capacity of the pile group is 5870,246 - 33176,233 tons. Single pile settlement using a semi-empirical method and resulted in a decrease of 50,100 - 59,490 mm. The settlement of the pile group used the vesic method and resulted in a decrease of 6,627 - 13,302 cm. consolidation decrease using the coefficient of volume change and resulted in a decrease of 104,024-576.047 mm with a time of 5,694-26,731 years. The calculation of lateral bearing capacity and pile deflection using the Broms method resulted in the lateral bearing capacity of the pile group of 3024-20580 tons and deflection of 1.485-5.888 mm. foundation reinforcement using the reference of SNI 2847-2019. Longitudinal reinforcement using 10D32 and stirrup reinforcement D16-50 and D16-75. Pile cap planning refers to SNI 2847-2019, resulting in a pile cap thickness of 1.5-4 meters. The X direction and Y direction reinforcement used are D32-150 for the pier and D32-150 and D25-150 for the abutment. The calculation of the cost budget plan uses the unit price analysis method and the resulting total cost is 73.574.031.053.
Perencanaan Pondasi Borepile Pada Jembatan, Studi Kasus : Jembatan Utama Cisadane
Asri Wulan (Autor:in) / Krismonika Pujiawati (Autor:in) / Jennie Kusumaningrum (Autor:in)
14.01.2023
Jurnal Sains dan Teknologi (JSIT); Vol. 3 No. 1 (2023): Jurnal Sains dan Teknologi (JSIT); 20-32 ; 2807-7393 ; 10.47233/jsit.v3i1
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
DDC:
690
PERENCANAAN PONDASI BORE PILE PADA PROYEK JEMBATAN NGUJANG II KAB.TULUNGAGUNG
DOAJ | 2018
|Pemanfaatan Pagar Jembatan Sebagai Vertical Garden: Studi Kasus Di Jembatan Gandong 1 - Magetan
DOAJ | 2017
|