Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
SAVING RESOURCES IN THE CONSTRUCTION OF HYDROELECTRIC POWER PLANTS
The article describes run-of-the-river hydroelectric power plants. The authors specify the importance of performing technical and economic calculations in justifying the large-sized units of the water-supplying channel of a run-of-the-river hydroelectric power plant: turbine pits and suction (discharge) pipes. The study shows that the amount of construction work and the total cost of building a hydroelectric power plant depend on the size of these water supply units. The research objective is to analyze the validity of establishing the main dimensions of the suction pipes for modern technical and economic conditions. The researchers use the discounted income method. The calculations are performed for a hydroelectric power plant with an elbow suction pipe. The analysis of how the operating conditions of a hydroelectric power plant influence the savings of construction resources is carried out. The analysis shows that saving construction resources by reducing the length of the suction pipe is justified if the hydroelectric power plamt is designed to work only at peak power loads. For hydroelectric power plants operating at semi-peak or base power loads, the additional construction costs would be appropriate if leading to the decrease in pressure loss and to the increase in electricity generation.
SAVING RESOURCES IN THE CONSTRUCTION OF HYDROELECTRIC POWER PLANTS
The article describes run-of-the-river hydroelectric power plants. The authors specify the importance of performing technical and economic calculations in justifying the large-sized units of the water-supplying channel of a run-of-the-river hydroelectric power plant: turbine pits and suction (discharge) pipes. The study shows that the amount of construction work and the total cost of building a hydroelectric power plant depend on the size of these water supply units. The research objective is to analyze the validity of establishing the main dimensions of the suction pipes for modern technical and economic conditions. The researchers use the discounted income method. The calculations are performed for a hydroelectric power plant with an elbow suction pipe. The analysis of how the operating conditions of a hydroelectric power plant influence the savings of construction resources is carried out. The analysis shows that saving construction resources by reducing the length of the suction pipe is justified if the hydroelectric power plamt is designed to work only at peak power loads. For hydroelectric power plants operating at semi-peak or base power loads, the additional construction costs would be appropriate if leading to the decrease in pressure loss and to the increase in electricity generation.
SAVING RESOURCES IN THE CONSTRUCTION OF HYDROELECTRIC POWER PLANTS
Balzannikov, Mikhail (Autor:in)
20.06.2019
doi:10.17770/etr2019vol1.4103
ENVIRONMENT. TECHNOLOGIES. RESOURCES. Proceedings of the International Scientific and Practical Conference; Vol 1 (2019): Environment. Technology. Resources. Proceedings of the 12th International Scientific and Practical Conference. Volume 1; 20-23 ; 2256-070X ; 1691-5402
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
DDC:
690
Construction of piottino hydroelectric power plants
Engineering Index Backfile | 1930
Bitumen in construction of hydroelectric power plants
Engineering Index Backfile | 1937
|Economic assessment of the fuel saving realized by hydroelectric power plants
Springer Verlag | 1980
|Economic assessment of the fuel saving realized by hydroelectric power plants
Online Contents | 1980
|Modern Hydroelectric Power Plants
Engineering Index Backfile | 1930
|