The Efficacy of Waste Management Plans in Australian Commercial Construction Refurbishment Projects
Renovation and refurbishment of the existingcommercial building stock is a growing area oftotal construction activity and a significantgenerator of waste sent to landfill in Australia. Awritten waste management plan (WMP) is awidespread regulatory requirement forcommercial office redevelopment projects. Thereis little evidence, however, that WMPs actuallyincrease the quantity of waste that is ultimatelydiverted from landfill. Some reports indicate anabsence of any formal verification or monitoringprocess by regulators to assess the efficacy ofthe plans. In order to gauge the extent of theproblem a survey was conducted of twenty fourconsultants and practitioners involved incommercial office building refurbishment projectsto determine the state of current practice withregard to WMPs and to elicit suggestions withregard to ways of making the process moreeffective. Considerable variation in commitmentto recycling policies was encountered indicatinga need to revisit waste minimisation practices ifthe environmental performance of refurbishmentprojects is to be improved.
The Efficacy of Waste Management Plans in Australian Commercial Construction Refurbishment Projects
Renovation and refurbishment of the existingcommercial building stock is a growing area oftotal construction activity and a significantgenerator of waste sent to landfill in Australia. Awritten waste management plan (WMP) is awidespread regulatory requirement forcommercial office redevelopment projects. Thereis little evidence, however, that WMPs actuallyincrease the quantity of waste that is ultimatelydiverted from landfill. Some reports indicate anabsence of any formal verification or monitoringprocess by regulators to assess the efficacy ofthe plans. In order to gauge the extent of theproblem a survey was conducted of twenty fourconsultants and practitioners involved incommercial office building refurbishment projectsto determine the state of current practice withregard to WMPs and to elicit suggestions withregard to ways of making the process moreeffective. Considerable variation in commitmentto recycling policies was encountered indicatinga need to revisit waste minimisation practices ifthe environmental performance of refurbishmentprojects is to be improved.
The Efficacy of Waste Management Plans in Australian Commercial Construction Refurbishment Projects
Hardie, Mary (Autor:in) / Khan, Shahed (Autor:in) / O'Donnell, Angela (Autor:in) / Miller, Graham (Autor:in)
23.11.2007
doi:10.5130/AJCEB.v7i2.2988
Construction Economics and Building; Vol 7 No 2 (2007): AJCEB; 26-36 ; 2204-9029
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
DDC:
690
The Efficacy of Waste Management Plans in Australian Commercial Construction Refurbishment Projects
DOAJ | 2012
|The Efficacy of Waste Management Plans in Australian Commercial Construction Refurbishment Projects
DOAJ | 2012
|Contractual systems for construction refurbishment projects
British Library Conference Proceedings | 1998
|A Conceptual Innovative Risk Management Model for Commercial Buildings Refurbishment Projects
BASE | 2021
|Monitoring Infrastructure during Construction and Refurbishment Projects
British Library Conference Proceedings | 2012
|