A STUDY ON BUILDING CONSTRUCTION INVESTMENT FEASIBILITY
The level of society’s awareness on education is very high. The society’s enthusiasm to take a higher education is enormous. Every year the society’s interest in joining Hasyim Asy'ari University of Tebuireng Jombang is increasing. For this reason, Hasyim Asy'ari University of Tebuireng Jombang plans to add the classes by constructing new buildings that can accommodate more students each year. Every construction certainly has a risk. To anticipate this, a feasibility study is carried out at the early stages of construction planning so that later the construction runs well. There are three methods used to analyze investment feasibility, namely, Net Present Value (NPV) method, Benefit Cost Ratio (BCR) method and Internal Rate of Return (IRR) method. Besides using those methods, the payback period for the building construction project of Hasyim Asy'ari University of Tebuireng Jombang is also calculated. Based on the results of the analysis conducted, it was found that the construction of Hasyim Asy'ari University of Tebuireng Jombang was feasible to be carried out referring to the NPV and B/C values which were higher than one and the IRR value was higher than MARR and the payback period was for 7 years and 5 months. Thus, the investment project is declared feasible to proceed.
A STUDY ON BUILDING CONSTRUCTION INVESTMENT FEASIBILITY
The level of society’s awareness on education is very high. The society’s enthusiasm to take a higher education is enormous. Every year the society’s interest in joining Hasyim Asy'ari University of Tebuireng Jombang is increasing. For this reason, Hasyim Asy'ari University of Tebuireng Jombang plans to add the classes by constructing new buildings that can accommodate more students each year. Every construction certainly has a risk. To anticipate this, a feasibility study is carried out at the early stages of construction planning so that later the construction runs well. There are three methods used to analyze investment feasibility, namely, Net Present Value (NPV) method, Benefit Cost Ratio (BCR) method and Internal Rate of Return (IRR) method. Besides using those methods, the payback period for the building construction project of Hasyim Asy'ari University of Tebuireng Jombang is also calculated. Based on the results of the analysis conducted, it was found that the construction of Hasyim Asy'ari University of Tebuireng Jombang was feasible to be carried out referring to the NPV and B/C values which were higher than one and the IRR value was higher than MARR and the payback period was for 7 years and 5 months. Thus, the investment project is declared feasible to proceed.
A STUDY ON BUILDING CONSTRUCTION INVESTMENT FEASIBILITY
Nugroho, Meriana Wahyu (Autor:in) / Supriono, Lyya (Autor:in)
02.11.2020
JICE Journal Innovation of Civil Engineering; Vol 1, No 1 (2020); 28-31 ; Jurnal Ilmiah Teknik Sipil - JITS; Vol 1, No 1 (2020); 28-31 ; 27755592
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
DDC:
690
Feasibility study of building envelopes selection for low-rise construction
Tema Archiv | 2015
|Economic feasibility of automation in building construction
British Library Conference Proceedings | 1997
|Economic feasibility of automation in building construction
British Library Conference Proceedings | 1997
|Building green : investment opportunities in sustainable construction materials
DSpace@MIT | 1998
|