Rework adversely impacts the performance of building projects. In this study, data were analyzed from 788 construction incidents in 40 Spanish building projects to determine the effects of project and managerial characteristics on rework costs. Finally, regression analysis was used to understand the relationships among contributing factors and to develop a model for rework prediction. Interestingly, the rework prediction model showed that only the original contract value (OCV) and the project location in relation to the company’s headquarters contributed to the regression model. Project type, type of organization, type of contract, and original contract duration (OCD), which represents the magnitude and complexity of a project, were represented by the OCV. This model for rework prediction based on original project conditions enables strategies to be put in place prior to the start of construction, to minimize uncertainties, to reduce impacts on project cost and schedule, and, thus, to improve productivity. ; Peer Reviewed ; Postprint (author's final draft)
Ordered Weighted Average optimization in Multiobjective Spanning Tree Problem
Rework adversely impacts the performance of building projects. In this study, data were analyzed from 788 construction incidents in 40 Spanish building projects to determine the effects of project and managerial characteristics on rework costs. Finally, regression analysis was used to understand the relationships among contributing factors and to develop a model for rework prediction. Interestingly, the rework prediction model showed that only the original contract value (OCV) and the project location in relation to the company’s headquarters contributed to the regression model. Project type, type of organization, type of contract, and original contract duration (OCD), which represents the magnitude and complexity of a project, were represented by the OCV. This model for rework prediction based on original project conditions enables strategies to be put in place prior to the start of construction, to minimize uncertainties, to reduce impacts on project cost and schedule, and, thus, to improve productivity. ; Peer Reviewed ; Postprint (author's final draft)
Ordered Weighted Average optimization in Multiobjective Spanning Tree Problem
Fernández Aréizaga, Elena (Autor:in) / Pozo, Miguel Angel (Autor:in) / Puerto Albandoz, Justo (Autor:in) / Scozzari, Andre (Autor:in) / Universitat Politècnica de Catalunya. Departament d'Estadística i Investigació Operativa / Universitat Politècnica de Catalunya. GNOM - Grup d'Optimització Numèrica i Modelització
01.08.2017
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Combinatorial probabilities , Àrees temàtiques de la UPC::Matemàtiques i estadística::Matemàtica discreta::Combinatòria , Combinatòria , Combinatorial analysis , Classificació AMS::60 Probability theory and stochastic processes::60C05 Combinatorial probability , Ordered median , Spanning trees , Combinatorial optimization , Classificació AMS::05 Combinatorics::05C Graph theory , Probabilitats , Multiobjective optimization , Ordered Weighted Average , Àrees temàtiques de la UPC::Matemàtiques i estadística::Probabilitat
DDC:
690
A linearization method for quadratic minimum spanning tree problem
British Library Online Contents | 2008
|Sustainable Development Goals Analysis with Ordered Weighted Average Operators
DOAJ | 2021
|A Weighted-Average frequency Tracker
NTIS | 1980
|British Library Online Contents | 2006
|