Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Best practice report - Installation procedures. Deliverable 3.6.2 from the MERiFIC Project
This report is a deliverable of MERiFIC Task 3. 6: ‘Installation Procedures’ and has been produced in a cross border collaboration between IFREMER and the University of Exeter. In this report different elements are presented for the planning and organisation of installation operations for the deployment of Marine energy plants. The optimization of installation procedures are discussed and brought in a context to potential costs optimization and the availability of suitable vessels is considered. Installation procedures, which were also investigated, should include pre-installation surveys so as to optimize the design of moorings and secure laying of the power cable, a specific feature of the commissioning of such Marine energy plants. Attention should also be given to the Health and Safety procedures. Finally, the influence of the weather conditions on the success of these installation operations was discussed and studied. Especially, "Access time" and "Waiting time" weather windows were assessed for different sites in both areas of south west Cornwall and the Iroise Sea, pointing out the importance of the seasonal variability of the wave climate for the planning of installation operations.
Best practice report - Installation procedures. Deliverable 3.6.2 from the MERiFIC Project
This report is a deliverable of MERiFIC Task 3. 6: ‘Installation Procedures’ and has been produced in a cross border collaboration between IFREMER and the University of Exeter. In this report different elements are presented for the planning and organisation of installation operations for the deployment of Marine energy plants. The optimization of installation procedures are discussed and brought in a context to potential costs optimization and the availability of suitable vessels is considered. Installation procedures, which were also investigated, should include pre-installation surveys so as to optimize the design of moorings and secure laying of the power cable, a specific feature of the commissioning of such Marine energy plants. Attention should also be given to the Health and Safety procedures. Finally, the influence of the weather conditions on the success of these installation operations was discussed and studied. Especially, "Access time" and "Waiting time" weather windows were assessed for different sites in both areas of south west Cornwall and the Iroise Sea, pointing out the importance of the seasonal variability of the wave climate for the planning of installation operations.
Best practice report - Installation procedures. Deliverable 3.6.2 from the MERiFIC Project
Maisondieu, Christophe (Autor:in) / Johanning, Lars (Autor:in)
01.03.2014
Paper
Elektronische Ressource
Englisch
DDC:
690
GreenCharge Project Deliverable: D2.7 Technical Monitoring Report and Feedbacks (Oslo)
BASE | 2022
|BASE | 2018
|