Exploration of Building Information Modeling and Integrated Project Cloud Service in early architectural design stages
In the evolving Architecture, Engineering, and Construction (AEC) industry, the use of Building Information Modeling (BIM) and Integrated Project Cloud Service (IPCS) has become crucial. These tools are particularly essential during the early design stages, as they enable comprehensive management and integration of project information, thus promoting effective decision-making throughout project lifecycles. This combined approach enhances inter-organizational collaborations, improves design and construction practices, and creates a communal data platform for stakeholders. This research explores the effectiveness of the BIM-IPCS system in streamlining data exchange and information flow during early design, suggesting ways to minimize errors, speed up processes, and reduce construction costs through dependable networks. Conclusively, this study underscores the significant impact of the BIM-IPCS system on project management, ensuring well-coordinated and informed construction while advocating for its role in driving innovative and efficient project delivery in the AEC industry.
Exploration of Building Information Modeling and Integrated Project Cloud Service in early architectural design stages
In the evolving Architecture, Engineering, and Construction (AEC) industry, the use of Building Information Modeling (BIM) and Integrated Project Cloud Service (IPCS) has become crucial. These tools are particularly essential during the early design stages, as they enable comprehensive management and integration of project information, thus promoting effective decision-making throughout project lifecycles. This combined approach enhances inter-organizational collaborations, improves design and construction practices, and creates a communal data platform for stakeholders. This research explores the effectiveness of the BIM-IPCS system in streamlining data exchange and information flow during early design, suggesting ways to minimize errors, speed up processes, and reduce construction costs through dependable networks. Conclusively, this study underscores the significant impact of the BIM-IPCS system on project management, ensuring well-coordinated and informed construction while advocating for its role in driving innovative and efficient project delivery in the AEC industry.
Exploration of Building Information Modeling and Integrated Project Cloud Service in early architectural design stages
Felicia Wagiri (Autor:in) / Shen-Guan Shih (Autor:in) / Kevin Harsono (Autor:in) / Tsung-Wei Cheng (Autor:in) / Mu-Kuan Lu (Autor:in)
2023
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Metadata by DOAJ is licensed under CC BY-SA 1.0
Supporting Tools for Early Stages of Architectural Design
SAGE Publications | 2014
|British Library Online Contents | 2019
|Integrated building performance evaluation in the early design stages
Elsevier | 1992
|Building Simulation for Architectural Design: a Programming Exploration
British Library Conference Proceedings | 2009
|