Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Apply of torque method at rationalization of work
Aim of the study was to analyse consumption of time for profession - cylinder grinder, by torque method.Method of torque following is used for detection of sorts and size of time slope, on detection of portion of individual sorts of time consumption and cause of time slope. By this way it is possible to find out coefficient of employment and recovery of workers in organizational unit. Advantage of torque survey is low costs on informations acquirement, non-fastidiousness per worker and observer, which is easy trained. It is mentally acceptable method for objects of survey.Finding and detection of reserves in activity of cylinders grinder result of torque was surveys. Loss of time presents till 8% of working time. In 5 - shift service and average occupiying of shift by 4,4 grinder ( from statistic information of service ), loss at grinder of cylinders are for whole centre 1,48 worker.According presented information it was recommended to cancel one job place - grinder of cylinders - and reduce state about one grinder. Next job place isn't possible cancel, because grindery of cylinders must to adapt to the grind line by number of polished cylinders in shift and semi - finishing of polished cylinders can not be high for often changes in area of grinding and sortiment changes.By this contribution we confirmed convenience of exploitation of torque method as one of the methods using during the job rationalization.
Apply of torque method at rationalization of work
Aim of the study was to analyse consumption of time for profession - cylinder grinder, by torque method.Method of torque following is used for detection of sorts and size of time slope, on detection of portion of individual sorts of time consumption and cause of time slope. By this way it is possible to find out coefficient of employment and recovery of workers in organizational unit. Advantage of torque survey is low costs on informations acquirement, non-fastidiousness per worker and observer, which is easy trained. It is mentally acceptable method for objects of survey.Finding and detection of reserves in activity of cylinders grinder result of torque was surveys. Loss of time presents till 8% of working time. In 5 - shift service and average occupiying of shift by 4,4 grinder ( from statistic information of service ), loss at grinder of cylinders are for whole centre 1,48 worker.According presented information it was recommended to cancel one job place - grinder of cylinders - and reduce state about one grinder. Next job place isn't possible cancel, because grindery of cylinders must to adapt to the grind line by number of polished cylinders in shift and semi - finishing of polished cylinders can not be high for often changes in area of grinding and sortiment changes.By this contribution we confirmed convenience of exploitation of torque method as one of the methods using during the job rationalization.
Apply of torque method at rationalization of work
Bandurová Miriam (Autor:in) / Novek Zoltán (Autor:in)
2001
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Metadata by DOAJ is licensed under CC BY-SA 1.0
Hydrometric network rationalization
British Library Conference Proceedings | 1996
|Rationalization by Roman Concrete
Online Contents | 1995
|Rationalization in reinforced concrete
Engineering Index Backfile | 1930
|Rationalization by Roman Concrete
British Library Online Contents | 1995
|Rationalization of reinforced-concrete design
Engineering Index Backfile | 1930
|