Construction Simulation Analysis of 60m-span Concrete Filled Steel Tube arch bridge
The construction process of the CFST arch bridge is complicated. The construction process not only affects the structural stress in the installation, but also determines the form a bridge and internal force of the bridge. In this paper, a 60m span concrete filled steel tube tied arch bridge is taken as the background, and a three-dimensional finite element simulation model is established by using the MIDAS/Civil bridge structure analysis software. The elevation of the main arch ring, the beam stress, the forces in hanger rods and the modal frequency of the main arch during the construction stage are calculated, and the construction process is simulated and analyzed. Effectively and reasonably guide the construction and ensure that the line and force conditions of the completed bridge meet the design requirements and provides a reliable technical guarantee for the safe construction of the bridge.
Construction Simulation Analysis of 60m-span Concrete Filled Steel Tube arch bridge
The construction process of the CFST arch bridge is complicated. The construction process not only affects the structural stress in the installation, but also determines the form a bridge and internal force of the bridge. In this paper, a 60m span concrete filled steel tube tied arch bridge is taken as the background, and a three-dimensional finite element simulation model is established by using the MIDAS/Civil bridge structure analysis software. The elevation of the main arch ring, the beam stress, the forces in hanger rods and the modal frequency of the main arch during the construction stage are calculated, and the construction process is simulated and analyzed. Effectively and reasonably guide the construction and ensure that the line and force conditions of the completed bridge meet the design requirements and provides a reliable technical guarantee for the safe construction of the bridge.
Construction Simulation Analysis of 60m-span Concrete Filled Steel Tube arch bridge
Shi Jing Xian (Autor:in) / Ding Qing Hua (Autor:in)
2018
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Metadata by DOAJ is licensed under CC BY-SA 1.0
Construction method of large-span concrete-filled steel tube arch bridge
Europäisches Patentamt | 2024
|Large-span concrete-filled steel tube arch bridge main arch structure and construction method
Europäisches Patentamt | 2021
|Large-span concrete-filled steel tube tied bar arch bridge construction method
Europäisches Patentamt | 2020
|Large-span deck type concrete-filled steel tube arch bridge
Europäisches Patentamt | 2021