Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Investigating critical failure drivers of construction project at planning stage in Saudi Arabia
Purpose – The purpose of this research is to identify the constraints and restrictions and their impact on the construction projects in Saudi Arabia from three key participants' perspectives for the planning stage. Design/methodology/approach – Using a descriptive-analytical approach, this research described and analyzed the frequency and severity of failure factors in construction projects in the planning stage using a five-Likert scale questionnaire in Saudi Arabia construction between 2019 and 2020. A total of 100 experts from contractors, consultants and owners were included in the study. Findings – The findings have shown that time dispute was the major factor affecting the projects to be failed. Similarly, cost overrun and total abandonment have an impact on project failures. The findings have indicated that government officials were involved in delaying the projects while contractors also failed in the project deliveries. Research limitations/implications – Further research is needed to investigate the relationship between failure characteristics and project success measures in the same stage, in addition to, factors of failure for construction projects' life-cycle stages. Originality/value – The findings have indicated that government officials were involved in delaying the projects while contractors also failed in the project deliveries.
Investigating critical failure drivers of construction project at planning stage in Saudi Arabia
Purpose – The purpose of this research is to identify the constraints and restrictions and their impact on the construction projects in Saudi Arabia from three key participants' perspectives for the planning stage. Design/methodology/approach – Using a descriptive-analytical approach, this research described and analyzed the frequency and severity of failure factors in construction projects in the planning stage using a five-Likert scale questionnaire in Saudi Arabia construction between 2019 and 2020. A total of 100 experts from contractors, consultants and owners were included in the study. Findings – The findings have shown that time dispute was the major factor affecting the projects to be failed. Similarly, cost overrun and total abandonment have an impact on project failures. The findings have indicated that government officials were involved in delaying the projects while contractors also failed in the project deliveries. Research limitations/implications – Further research is needed to investigate the relationship between failure characteristics and project success measures in the same stage, in addition to, factors of failure for construction projects' life-cycle stages. Originality/value – The findings have indicated that government officials were involved in delaying the projects while contractors also failed in the project deliveries.
Investigating critical failure drivers of construction project at planning stage in Saudi Arabia
Saleh Alsulamy (Autor:in)
2022
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Metadata by DOAJ is licensed under CC BY-SA 1.0
British Library Online Contents | 2003
|DOAJ | 2025
|Construction Insurance in Saudi Arabia
Online Contents | 1998
|Saudi Arabia pushes on with expansion project
IuD Bahn | 2006
|