Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Flood Season Staging and Adjustment of Limited Water Level for a Multi-Purpose Reservoir
A reasonable flood season delineation can effectively implement staged reservoir scheduling and improve water resource efficiency. Therefore, this study is aimed at analyzing the flood period segmentation and optimizing the staged flood limit water levels (FLWLs) for a multi-purpose reservoir, the Longtan Reservoir, China. The rainfall seasonality index () and the runoff seasonality index () are used to evaluate the feasibility and rationality of the flood period staging. The fractal method is then used to segment the flood season. Finally, the design flood is carried out to optimize the staged FLWLs. The results show that the is an effective indicator for judging the feasibility and verifying the rationality of flood segmentation. The flood period can be segmented into the pre-flood season (12 April–29 May), the main flood season (30 May–3 September), and the post-flood season (4 September–9 November). The FLWLs in the main flood and the post-flood season can be raised by 2.05 m and 3.45 m, and the effective reservoir capacity is increased by 5.810 billion m3 and 6.337 billion m3, according to the results of the flood season division.
Flood Season Staging and Adjustment of Limited Water Level for a Multi-Purpose Reservoir
A reasonable flood season delineation can effectively implement staged reservoir scheduling and improve water resource efficiency. Therefore, this study is aimed at analyzing the flood period segmentation and optimizing the staged flood limit water levels (FLWLs) for a multi-purpose reservoir, the Longtan Reservoir, China. The rainfall seasonality index () and the runoff seasonality index () are used to evaluate the feasibility and rationality of the flood period staging. The fractal method is then used to segment the flood season. Finally, the design flood is carried out to optimize the staged FLWLs. The results show that the is an effective indicator for judging the feasibility and verifying the rationality of flood segmentation. The flood period can be segmented into the pre-flood season (12 April–29 May), the main flood season (30 May–3 September), and the post-flood season (4 September–9 November). The FLWLs in the main flood and the post-flood season can be raised by 2.05 m and 3.45 m, and the effective reservoir capacity is increased by 5.810 billion m3 and 6.337 billion m3, according to the results of the flood season division.
Flood Season Staging and Adjustment of Limited Water Level for a Multi-Purpose Reservoir
Chongxun Mo (Autor:in) / Juan Deng (Autor:in) / Xingbi Lei (Autor:in) / Yuli Ruan (Autor:in) / Shufeng Lai (Autor:in) / Guikai Sun (Autor:in) / Zhenxiang Xing (Autor:in)
2022
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Metadata by DOAJ is licensed under CC BY-SA 1.0
Adjustment and application of the limited level of reservoirs during the flood season
British Library Online Contents | 2005
|Study on the Staged Operation of a Multi-Purpose Reservoir in Flood Season and Its Effect Evaluation
DOAJ | 2021
|Reservoir Flood Season Segmentation and Optimal Operation of Flood-Limiting Water Levels
Online Contents | 2015
|Ensemble Method for Reservoir Flood Season Segmentation
British Library Online Contents | 2017
|