Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Case Study: Effects of a Partial-Debris Dam on Riverbank Erosion in the Parlung Tsangpo River, China
This paper examines two successive debris flows that deposited a total of 1.4 million m3 of sediment into the Parlung Tsangpo River in China in 2010. As a result of these deposits, a partial-debris dam was formed in the river. This dam rerouted the discharge in the river along one of the riverbanks, which supported a highway. The rerouted discharge eroded the riverbank and the highway eventually collapsed. To enhance our understanding of the threat posed by partial-debris dams, a field investigation was carried out to measure the discharge in the river and to collect soil samples of the collapsed riverbank. Findings from the field investigation were then used to back-analyze fluvial erosion along the riverbank using a combined erosion framework proposed in this study. This combined framework adopts a dam-breach erosion model which can capture the progressive nature of fluvial erosion by considering the particle size distribution of the soil being eroded. The results from the back-analysis were then evaluated against unique high-resolution images obtained from satellites. This case study not only highlights the consequences of the formation of partial-debris dams on nearby infrastructure, but it also proposes the use of a combined erosion framework to provide a first-order assessment of riverbank stability. Unique high-resolution satellite images are used to assess the proposed erosion framework and key challenges in assessing erosion are discussed.
Case Study: Effects of a Partial-Debris Dam on Riverbank Erosion in the Parlung Tsangpo River, China
This paper examines two successive debris flows that deposited a total of 1.4 million m3 of sediment into the Parlung Tsangpo River in China in 2010. As a result of these deposits, a partial-debris dam was formed in the river. This dam rerouted the discharge in the river along one of the riverbanks, which supported a highway. The rerouted discharge eroded the riverbank and the highway eventually collapsed. To enhance our understanding of the threat posed by partial-debris dams, a field investigation was carried out to measure the discharge in the river and to collect soil samples of the collapsed riverbank. Findings from the field investigation were then used to back-analyze fluvial erosion along the riverbank using a combined erosion framework proposed in this study. This combined framework adopts a dam-breach erosion model which can capture the progressive nature of fluvial erosion by considering the particle size distribution of the soil being eroded. The results from the back-analysis were then evaluated against unique high-resolution images obtained from satellites. This case study not only highlights the consequences of the formation of partial-debris dams on nearby infrastructure, but it also proposes the use of a combined erosion framework to provide a first-order assessment of riverbank stability. Unique high-resolution satellite images are used to assess the proposed erosion framework and key challenges in assessing erosion are discussed.
Case Study: Effects of a Partial-Debris Dam on Riverbank Erosion in the Parlung Tsangpo River, China
Clarence Edward Choi (Autor:in) / Yifei Cui (Autor:in) / Kelvin Yuk Kit Au (Autor:in) / Haiming Liu (Autor:in) / Jiao Wang (Autor:in) / Dingzhu Liu (Autor:in) / Hao Wang (Autor:in)
2018
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Metadata by DOAJ is licensed under CC BY-SA 1.0
Stability Analysis of Riverbank Erosion
Springer Verlag | 2022
|Stability Analysis of Riverbank Erosion
TIBKAT | 2023
|Stability Concepts of Riverbanks: A Case Study of Riverbank Erosion Along the Snake River, Oregon
British Library Conference Proceedings | 2005
|