Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Collaborative Mining Sequence Optimization for Multiple Stopes under Intensive Mining
The optimization of a mining sequence not only reduces stress concentration in surrounding rock but also prevents underground debris flows, significantly improving safety. Firstly, the 870–898 m level of the eastern mining area in the Tiaoshuihe phosphate mine was divided into 25 ore blocks, and six different mining sequences were designed for this area. Then, it was calculated that five ore blocks must be processed simultaneously to reach the annual production output. The distances between the five simultaneously mined ore blocks will inevitably affect the efficiency of the equipment for any scheme. So, a collaborative model considering both the area stability and production capacity was established by combining the distance between the centers of the five ore blocks as an index. Differences in stability, deformation, and plastic zone size between the schemes are compared. The calculation results show that a mining scheme with a convex stepped shape produces the best results. These results provide a general method for entropy-based mining sequence optimization and an optimal solution for the Tiaoshuihe phosphate mine.
Collaborative Mining Sequence Optimization for Multiple Stopes under Intensive Mining
The optimization of a mining sequence not only reduces stress concentration in surrounding rock but also prevents underground debris flows, significantly improving safety. Firstly, the 870–898 m level of the eastern mining area in the Tiaoshuihe phosphate mine was divided into 25 ore blocks, and six different mining sequences were designed for this area. Then, it was calculated that five ore blocks must be processed simultaneously to reach the annual production output. The distances between the five simultaneously mined ore blocks will inevitably affect the efficiency of the equipment for any scheme. So, a collaborative model considering both the area stability and production capacity was established by combining the distance between the centers of the five ore blocks as an index. Differences in stability, deformation, and plastic zone size between the schemes are compared. The calculation results show that a mining scheme with a convex stepped shape produces the best results. These results provide a general method for entropy-based mining sequence optimization and an optimal solution for the Tiaoshuihe phosphate mine.
Collaborative Mining Sequence Optimization for Multiple Stopes under Intensive Mining
Long Zhang (Autor:in) / Jianhua Hu (Autor:in) / Xinzhong Wang (Autor:in) / Xiuwei Chai (Autor:in) / Lei Zhao (Autor:in)
2021
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Metadata by DOAJ is licensed under CC BY-SA 1.0
Mining very large adjacent stopes using an integrated rock mechanics approach
British Library Conference Proceedings | 2007
|Mining through filled stopes using shotcrete linings at Xstrata - Mount Isa Mines
British Library Conference Proceedings | 2004
|Study on overlying strata movement patterns and mechanisms in super-large mining height stopes
Online Contents | 2023
|Stability assessment based on fuzzy-sets for mining stopes in Fengshan Copper Mine
British Library Online Contents | 2002
|Study on overlying strata movement patterns and mechanisms in super-large mining height stopes
Springer Verlag | 2023
|