Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Proposed procedure for optimal maintenance scheduling under emergent failures
Production lines are usually subjected to emergent machine failures. Such emergent failures disrupt pre-established maintenance schedules, which challenge maintenance engineers to react to those failures in real time. This research proposes an optimization procedure for optimizing scheduling repairs of emergent failures. Three optimization models are developed. Model I schedules failures in newly idle repair shops with the objective of maximizing the number of scheduled repairs. Model II maximizes the number of assigned repairs to untapped ranges. Model III maximizes both the number of assigned failure repairs and satisfaction on regular and emergency repairs by resequencing regular and emergent failures in the shop that contains the largest free margin. A real case study is provided to illustrate the proposed optimization procedure. Results reveal that the proposed models efficiently scheduled and sequenced emergent failures in the idle maintenance shops, the untapped ranges between repairs of regular failures, and in the maintenance shop with the largest free margin. In conclusions, the proposed models can greatly support maintenance engineers in planning repairs under unexpected failures.
Proposed procedure for optimal maintenance scheduling under emergent failures
Production lines are usually subjected to emergent machine failures. Such emergent failures disrupt pre-established maintenance schedules, which challenge maintenance engineers to react to those failures in real time. This research proposes an optimization procedure for optimizing scheduling repairs of emergent failures. Three optimization models are developed. Model I schedules failures in newly idle repair shops with the objective of maximizing the number of scheduled repairs. Model II maximizes the number of assigned repairs to untapped ranges. Model III maximizes both the number of assigned failure repairs and satisfaction on regular and emergency repairs by resequencing regular and emergent failures in the shop that contains the largest free margin. A real case study is provided to illustrate the proposed optimization procedure. Results reveal that the proposed models efficiently scheduled and sequenced emergent failures in the idle maintenance shops, the untapped ranges between repairs of regular failures, and in the maintenance shop with the largest free margin. In conclusions, the proposed models can greatly support maintenance engineers in planning repairs under unexpected failures.
Proposed procedure for optimal maintenance scheduling under emergent failures
Abbas Al-Refaie (Autor:in) / Heba Al-Shalaldeh (Autor:in) / Natalija Lepkova (Autor:in)
2020
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Metadata by DOAJ is licensed under CC BY-SA 1.0
Optimal restoration scheduling for earthquake disaster by emergent computing
British Library Conference Proceedings | 2004
|Optimal berth allocation under regular and emergent vessel arrivals
SAGE Publications | 2021
|Prevent failures with compressor maintenance
British Library Online Contents | 1994
|OPTIMAL MAINTENANCE SCHEDULING FOR WATER DISTRIBUTION SYSTEMS
Taylor & Francis Verlag | 1992
|Preventing failures and predicting gully maintenance
British Library Online Contents | 2014