Objective Taking the interchange renovation construction of Beijing Subway Line 10 Xitucheng Station as example, the construction scheme for interchange renovation in existing station without reserved transfer conditions is studied. Method To meet the interchange requirements with Beijing Subway Changnan Line, the existing Line 1 Xitucheng Station undergoes an interchange renovation. Openings are made on the side walls of this station concourse floor to connect with the interchange passage. The entire concourse level is cleared and converted into a paid area, with ticket gate and security inspection relocated to ground or underground halls at each entrance. Escalators and elevators are added by creating openings in the floor between the concourse and platform levels. Additionally, settlement deformation monitoring of the concrete structures in the station construction area is conducted to control the impact of activities such as side wall demolition and floor openings on existing station structure. This ensures the safety and stability of the concrete structure during the interchange renovation construction at Beijing Subway Line 10 Xitucheng Station. Result & Conclusion It is suggested to hold long-term foresight in future station planning, carry out station structure design from the macro-perspective of urban rail transit development, and preserve sufficient interchange space.
Interchange Renovation Construction Technology of Beijing Subway Line 10 Xitucheng Station
Objective Taking the interchange renovation construction of Beijing Subway Line 10 Xitucheng Station as example, the construction scheme for interchange renovation in existing station without reserved transfer conditions is studied. Method To meet the interchange requirements with Beijing Subway Changnan Line, the existing Line 1 Xitucheng Station undergoes an interchange renovation. Openings are made on the side walls of this station concourse floor to connect with the interchange passage. The entire concourse level is cleared and converted into a paid area, with ticket gate and security inspection relocated to ground or underground halls at each entrance. Escalators and elevators are added by creating openings in the floor between the concourse and platform levels. Additionally, settlement deformation monitoring of the concrete structures in the station construction area is conducted to control the impact of activities such as side wall demolition and floor openings on existing station structure. This ensures the safety and stability of the concrete structure during the interchange renovation construction at Beijing Subway Line 10 Xitucheng Station. Result & Conclusion It is suggested to hold long-term foresight in future station planning, carry out station structure design from the macro-perspective of urban rail transit development, and preserve sufficient interchange space.
Interchange Renovation Construction Technology of Beijing Subway Line 10 Xitucheng Station
YE Xinfeng (Autor:in) / HUANG Mingli (Autor:in) / ZHANG Zhien (Autor:in) / LI Zichen (Autor:in) / SUN Ming (Autor:in) / FAN Liping (Autor:in)
2024
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Metadata by DOAJ is licensed under CC BY-SA 1.0
Analyses on Junction Line Construction of Beijing Subway
British Library Conference Proceedings | 2001
|Environmental risk management for a cross interchange subway station construction in China
Online Contents | 2011
|Environmental risk management for a cross interchange subway station construction in China
British Library Online Contents | 2011
|Research on Construction Risk Management System for Beijing Subway Suzhou Street Station
British Library Conference Proceedings | 2011
|