Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Failure Analysis of Transmission Tower in Full-Scale Tests
With the rapid development of Ultra-High Voltage (UHV) transmission lines, it is necessary to study the performance of UHV transmission towers. First, we performed full-scale tests on a transmission tower under seven loading patterns. Then, the test results were compared with the calculation results of the Chinese tower design software Transmission Tower Analysis Program (TTA), and the failure location of the tower and the stress characteristics of the key parts were studied. Finally, we discuss the influence of bolt slippage and a new joint on the tower performance, and propose some design proposals for the current Chinese code, based on the test results. The results show that a bolt slip will significantly increase the displacement of the transmission tower, but the residual displacement can correct it. The new joint design has good mechanical performance. The bracing member at the bottom of the tower leg is located at the connection of the tower leg and the foundation, and there is a significant sudden change in stiffness, which we recommend designing according to 4% of the axial force of the main members.
Failure Analysis of Transmission Tower in Full-Scale Tests
With the rapid development of Ultra-High Voltage (UHV) transmission lines, it is necessary to study the performance of UHV transmission towers. First, we performed full-scale tests on a transmission tower under seven loading patterns. Then, the test results were compared with the calculation results of the Chinese tower design software Transmission Tower Analysis Program (TTA), and the failure location of the tower and the stress characteristics of the key parts were studied. Finally, we discuss the influence of bolt slippage and a new joint on the tower performance, and propose some design proposals for the current Chinese code, based on the test results. The results show that a bolt slip will significantly increase the displacement of the transmission tower, but the residual displacement can correct it. The new joint design has good mechanical performance. The bracing member at the bottom of the tower leg is located at the connection of the tower leg and the foundation, and there is a significant sudden change in stiffness, which we recommend designing according to 4% of the axial force of the main members.
Failure Analysis of Transmission Tower in Full-Scale Tests
Xiuyun Gao (Autor:in) / Rong Yi (Autor:in) / Lingquan Zhang (Autor:in) / Xiao Jiang (Autor:in) / Jiaxiang Li (Autor:in)
2022
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Metadata by DOAJ is licensed under CC BY-SA 1.0
Reliability Analysis and Full-Scale Testing of Transmission Tower
Online Contents | 1996
|Reliability Analysis and Full-Scale Testing of Transmission Tower
British Library Online Contents | 1996
|Uplift resistance tests on full size transmission tower foundations
Engineering Index Backfile | 1964
|Evaluation of Dynamic Analysis Results Using Full-Scale Lattice Tower Tests
British Library Conference Proceedings | 1996
|