A New Restoration Strategy in Microgrids after a Blackout with Priority in Critical Loads
The danger of a total blackout in a wide area or, even worse, in a country is always present. The restoration methods after a blackout mainly focus on the strategy that the dispatchers in the control centers of the Transmission System Operator will follow than the abilities that the distribution’s microgrids have. This study suggests a restoration technique to improve distribution system resilience following a blackout, using distributed generation for the restoration of important loads. The goal of the restoration problem is to maximize the number of critical loads that are restored following the catastrophic incident. Under the restrictions of the DGs and the network, the DGs with good black start capability are restored first. Load weight and node importance degree are suggested during the recovery path selection procedure, while taking node topological importance and load importance into account. A mixed-integer linear program (MILP) is used to simulate the issue, and the modified IEEE 39-bus test system is used to verify the efficacy of the suggested restoration approach.
A New Restoration Strategy in Microgrids after a Blackout with Priority in Critical Loads
The danger of a total blackout in a wide area or, even worse, in a country is always present. The restoration methods after a blackout mainly focus on the strategy that the dispatchers in the control centers of the Transmission System Operator will follow than the abilities that the distribution’s microgrids have. This study suggests a restoration technique to improve distribution system resilience following a blackout, using distributed generation for the restoration of important loads. The goal of the restoration problem is to maximize the number of critical loads that are restored following the catastrophic incident. Under the restrictions of the DGs and the network, the DGs with good black start capability are restored first. Load weight and node importance degree are suggested during the recovery path selection procedure, while taking node topological importance and load importance into account. A mixed-integer linear program (MILP) is used to simulate the issue, and the modified IEEE 39-bus test system is used to verify the efficacy of the suggested restoration approach.
A New Restoration Strategy in Microgrids after a Blackout with Priority in Critical Loads
Vasiliki Vita (Autor:in) / Georgios Fotis (Autor:in) / Christos Pavlatos (Autor:in) / Valeri Mladenov (Autor:in)
2023
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Metadata by DOAJ is licensed under CC BY-SA 1.0
Model-based optimization of PV-based microgrids considering grid blackout and battery lifetime
BASE | 2021
|Optimal Microgrids in Buildings with Critical Loads and Hybrid Energy Storage
DOAJ | 2024
|Perspectives: ... After the Blackout of 2003
Online Contents | 2003
Kommentar - Brownout — Blackout
Online Contents | 2011
|