Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Study on Floor Heave Characteristics and the Control Method of Gob-Side Entry Driving in Weakly Cemented Soft Rock
Aiming at the problems of large deformation, long duration, and difficult control of floor heave in gob-side entry driving in weakly cemented soft rock, this paper takes the weakly cemented soft rock mining area in Western China as the engineering background, and studies the characteristics and mechanism of floor heave in gob-side entry driving in weakly cemented soft rock by means of a field investigation, physical component analysis, mechanical property tests of the surrounding rock, and the stress monitoring of the surrounding rock. The classification control method of floor heave is put forward, and field tests are conducted. The results show that: (1) The floor heave characteristics of the dynamic change in the floor heave peak position of gob-side entry driving from the coal pillar side to the mining side are obtained through field observation. (2) Based on the analysis of field data and laboratory test data, it is concluded that the stability time of the overlying strata in gob-side entry driving is about 8 to 12 months. The main internal cause of roadway floor heave is the low load resistance of weakly cemented soft rock. High stress and strong disturbances are the main power sources of strong floor heave. The mechanism of floor heave affected by dynamic lateral abutment pressure is summarized, and the classification control method of floor heave is proposed. (3) The gob-side entry driving support technologies of “adjusting excavation deployment” and “surrounding rock pressure relief and improving support” are proposed. Through field tests, the floor heave can be effectively controlled.
Study on Floor Heave Characteristics and the Control Method of Gob-Side Entry Driving in Weakly Cemented Soft Rock
Aiming at the problems of large deformation, long duration, and difficult control of floor heave in gob-side entry driving in weakly cemented soft rock, this paper takes the weakly cemented soft rock mining area in Western China as the engineering background, and studies the characteristics and mechanism of floor heave in gob-side entry driving in weakly cemented soft rock by means of a field investigation, physical component analysis, mechanical property tests of the surrounding rock, and the stress monitoring of the surrounding rock. The classification control method of floor heave is put forward, and field tests are conducted. The results show that: (1) The floor heave characteristics of the dynamic change in the floor heave peak position of gob-side entry driving from the coal pillar side to the mining side are obtained through field observation. (2) Based on the analysis of field data and laboratory test data, it is concluded that the stability time of the overlying strata in gob-side entry driving is about 8 to 12 months. The main internal cause of roadway floor heave is the low load resistance of weakly cemented soft rock. High stress and strong disturbances are the main power sources of strong floor heave. The mechanism of floor heave affected by dynamic lateral abutment pressure is summarized, and the classification control method of floor heave is proposed. (3) The gob-side entry driving support technologies of “adjusting excavation deployment” and “surrounding rock pressure relief and improving support” are proposed. Through field tests, the floor heave can be effectively controlled.
Study on Floor Heave Characteristics and the Control Method of Gob-Side Entry Driving in Weakly Cemented Soft Rock
Xuerui Yang (Autor:in) / Fenghai Yu (Autor:in) / Chengfu Ma (Autor:in) / Tao Zhang (Autor:in) / Bo Wang (Autor:in) / Xin Zhao (Autor:in)
2023
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Metadata by DOAJ is licensed under CC BY-SA 1.0
The Floor Heave Mechanism and Control Technology of Gob-Side Entry Retaining of Soft Rock Floor
DOAJ | 2023
|Floor Heave Controlling Technology of Deep Soft Rock Roadway
Tema Archiv | 2012
|Floor Heave Controlling Technology of Deep Soft Rock Roadway
Trans Tech Publications | 2012
|Floor Heave Controlling Technology of Deep Soft Rock Roadway
British Library Conference Proceedings | 2012
|Flexural floor heave mechanism and floor corner piles control technology in soft rock roadway
DOAJ | 2021
|