A Monthly Hydropower Scheduling Model of Cascaded Reservoirs with the Zoutendijk Method
A monthly hydropower scheduling determines the monthly flows, storage, and power generation of each reservoir/hydropower plant over a planning horizon to maximize the total revenue or minimize the total operational cost. The problem is typically a complex and nonlinear optimization that involves equality and inequality constraints including the water balance, hydraulic coupling between cascaded hydropower plants, bounds on the reservoir storage, etc. This work applied the Zoutendijk algorithm for the first time to a medium/long-term hydropower scheduling of cascaded reservoirs, where the generating discharge capacity is handled with an iterative procedure, while the other head-related nonlinear constraints are represented with exponential functions fitting to discrete points. The procedure starts at an initial feasible solution, from which it finds a feasible improving direction, along which a better feasible solution is sought with a one-dimensional search. The results demonstrate that the Zoutendijk algorithm, when applied to six cascaded hydropower reservoirs on the Lancang River, worked very well in maximizing the hydropower production while ensuring the highest firm power output to be secured.
A Monthly Hydropower Scheduling Model of Cascaded Reservoirs with the Zoutendijk Method
A monthly hydropower scheduling determines the monthly flows, storage, and power generation of each reservoir/hydropower plant over a planning horizon to maximize the total revenue or minimize the total operational cost. The problem is typically a complex and nonlinear optimization that involves equality and inequality constraints including the water balance, hydraulic coupling between cascaded hydropower plants, bounds on the reservoir storage, etc. This work applied the Zoutendijk algorithm for the first time to a medium/long-term hydropower scheduling of cascaded reservoirs, where the generating discharge capacity is handled with an iterative procedure, while the other head-related nonlinear constraints are represented with exponential functions fitting to discrete points. The procedure starts at an initial feasible solution, from which it finds a feasible improving direction, along which a better feasible solution is sought with a one-dimensional search. The results demonstrate that the Zoutendijk algorithm, when applied to six cascaded hydropower reservoirs on the Lancang River, worked very well in maximizing the hydropower production while ensuring the highest firm power output to be secured.
A Monthly Hydropower Scheduling Model of Cascaded Reservoirs with the Zoutendijk Method
Binbin Zhou (Autor:in) / Suzhen Feng (Autor:in) / Zifan Xu (Autor:in) / Yan Jiang (Autor:in) / Youxiang Wang (Autor:in) / Kai Chen (Autor:in) / Jinwen Wang (Autor:in)
2022
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Metadata by DOAJ is licensed under CC BY-SA 1.0
DOAJ | 2023
|Chance-Constrained Optimal Hedging Rules for Cascaded Hydropower Reservoirs
British Library Online Contents | 2014
|