An expansion and reconstruction project case for the leachate treatment station in Handan
Due to the rapid increase of landfill volume and the aging and damage of the leachate treatment facilities at a landfill in Handan, the original leachate treatment station at the landfill could not meet the existing leachate treatment needs. The combined process of “pretreatment+external MBR+nanofiltration(NF)+reverse osmosis(RO)” was adopted to expand and reconstruct the original leachate treatment station,and a new nanofiltration concentration reduction system was built. The “material membrane reduction+humic acid extraction” process was adopted to achieve concentration reduction treatment. The problems of tight schedules, compact sites, and shortage of funds were effectively solved through rational layout, reconstruction of old buildings, and construction of new steel tanks. After the expansion and reconstruction, the treatment capacity of the leachate treatment station was 500 m³/d with the yield of effluent clear liquid as 95%. The effluent water quality stably met the emission standard of Table 2 in the “Standard for Pollution Control on the Landfill Site of Municipal Solid Waste”(GB 16889‒2008). The total investment for the project was 22.18 million yuan, and the actual operating cost of the renovated leachate treatment station was 41.82 yuan/m3.
An expansion and reconstruction project case for the leachate treatment station in Handan
Due to the rapid increase of landfill volume and the aging and damage of the leachate treatment facilities at a landfill in Handan, the original leachate treatment station at the landfill could not meet the existing leachate treatment needs. The combined process of “pretreatment+external MBR+nanofiltration(NF)+reverse osmosis(RO)” was adopted to expand and reconstruct the original leachate treatment station,and a new nanofiltration concentration reduction system was built. The “material membrane reduction+humic acid extraction” process was adopted to achieve concentration reduction treatment. The problems of tight schedules, compact sites, and shortage of funds were effectively solved through rational layout, reconstruction of old buildings, and construction of new steel tanks. After the expansion and reconstruction, the treatment capacity of the leachate treatment station was 500 m³/d with the yield of effluent clear liquid as 95%. The effluent water quality stably met the emission standard of Table 2 in the “Standard for Pollution Control on the Landfill Site of Municipal Solid Waste”(GB 16889‒2008). The total investment for the project was 22.18 million yuan, and the actual operating cost of the renovated leachate treatment station was 41.82 yuan/m3.
An expansion and reconstruction project case for the leachate treatment station in Handan
ZHU Haidong (Autor:in) / ZHU Weibing (Autor:in)
2024
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Metadata by DOAJ is licensed under CC BY-SA 1.0
Environmental Risk Assessment of Handan Chenguang Bio-Technology Group Protein Project
British Library Online Contents | 2010
|Discussion on the Site Selection of Handan History Settlements
Trans Tech Publications | 2013
|Discussion on the Site Selection of Handan History Settlements
British Library Conference Proceedings | 2013
|Villa Dominico Landfill Vertical Expansion Project (VEP) Leachate Treatment System Design
British Library Conference Proceedings | 1996
|Assessment and Valuation of Groundwater Ecosystem Services: A Case Study of Handan City, China
DOAJ | 2020
|