Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Research on the Unit Black-Start Strategy Considering Recovery Path and Start Sequence
Large-scale power outage events bring serious economic losses to national and social development and cause bad impacts, and the reasonable formulation of a unit black-start strategy is the basis of power outage recovery. Firstly, the Dijkstra shortest path algorithm is used to search for the optimal recovery path of the unit to be started after a major blackout occurs, and secondly, a comprehensive index of the unit start sequence considering the unit characteristics and unit distance is defined to guide the unit start sequence formulation by combining the unit capacity, climbing rate, start power, and other characteristics with the recovery time and capacitance value of the recovery path. Finally, based on the unit start sequence and optimal recovery path, and taking into account the unit start constraints, a complete unit black-start strategy is proposed, and the effectiveness of this strategy is verified by IEEE30 node system simulation. The results show that the proposed unit black-start strategy can reduce the unit recovery time and improve the recovery success rate.
Research on the Unit Black-Start Strategy Considering Recovery Path and Start Sequence
Large-scale power outage events bring serious economic losses to national and social development and cause bad impacts, and the reasonable formulation of a unit black-start strategy is the basis of power outage recovery. Firstly, the Dijkstra shortest path algorithm is used to search for the optimal recovery path of the unit to be started after a major blackout occurs, and secondly, a comprehensive index of the unit start sequence considering the unit characteristics and unit distance is defined to guide the unit start sequence formulation by combining the unit capacity, climbing rate, start power, and other characteristics with the recovery time and capacitance value of the recovery path. Finally, based on the unit start sequence and optimal recovery path, and taking into account the unit start constraints, a complete unit black-start strategy is proposed, and the effectiveness of this strategy is verified by IEEE30 node system simulation. The results show that the proposed unit black-start strategy can reduce the unit recovery time and improve the recovery success rate.
Research on the Unit Black-Start Strategy Considering Recovery Path and Start Sequence
Jie Zhao (Autor:in) / Yilin Liang (Autor:in) / Yudi Fang (Autor:in) / Yixuan Weng (Autor:in) / Weizhe Ma (Autor:in) / Huaixun Zhang (Autor:in) / Yiyang Zhang (Autor:in)
2022
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Metadata by DOAJ is licensed under CC BY-SA 1.0
Indonesian thermal unit start-up
Online Contents | 1995
OZ considering high-grade start for Carrapateena mining
Online Contents | 2015
University Start-Ups: The Relationship between Faculty Start-Ups and Student Start-Ups
DOAJ | 2020
|Online Contents | 1994
|