Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Comparison between traditional project appraisal methods and uncertainty analysis applied to mining planning
Abstract Long-term mining planning is a complex process which involves a large number of variables and uncertainties. Traditional discount cash flow (DCF) is usually used in the evaluation of mining projects. DCF includes net present value (NPV), internal rate of return (IRR), and profitability index (PI). A sensitivity analysis is usually carried out to evaluate the impact of the main variables on the project. Another way to measure uncertainties is through the Monte Carlo simulation (MCS). The objective of this study is to evaluate and compare the DCF methods and measure uncertainties through sensitivity analysis and MCS in the evaluation of mine sequencing. A case study of a phosphate mine project was used to chart the comparative study. In the results, NPV and uncertainty analysis through MCS were more consistent.
Comparison between traditional project appraisal methods and uncertainty analysis applied to mining planning
Abstract Long-term mining planning is a complex process which involves a large number of variables and uncertainties. Traditional discount cash flow (DCF) is usually used in the evaluation of mining projects. DCF includes net present value (NPV), internal rate of return (IRR), and profitability index (PI). A sensitivity analysis is usually carried out to evaluate the impact of the main variables on the project. Another way to measure uncertainties is through the Monte Carlo simulation (MCS). The objective of this study is to evaluate and compare the DCF methods and measure uncertainties through sensitivity analysis and MCS in the evaluation of mine sequencing. A case study of a phosphate mine project was used to chart the comparative study. In the results, NPV and uncertainty analysis through MCS were more consistent.
Comparison between traditional project appraisal methods and uncertainty analysis applied to mining planning
Marcélio Prado Fontes (Autor:in) / Jair Carlos Koppe (Autor:in) / Nelson Albuquerque (Autor:in)
2020
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Metadata by DOAJ is licensed under CC BY-SA 1.0
Structural appraisal of traditional buildings
TIBKAT | 1991
|Structural Appraisal of Traditional Buildings
Emerald Group Publishing | 2005
Uncertainty analysis in construction project's appraisal phase
British Library Conference Proceedings | 2007
|Developments in Project Appraisal
British Library Conference Proceedings | 2002
|Teaching innovation: comparison between project-based and traditional learning approaches
BASE | 2021
|