Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction and Application of Reservoir Flood Control Operation Rules Using the Decision Tree Algorithm
Current conventional and optimal reservoir flood control operation methods insufficiently utilize historical reservoir operation data, which include rainfall, runoff generation, and inflow from the watershed, as well as the operational experience of decision makers over many years. Therefore, this study proposed and evaluated a new method for extracting reservoir flood control operation rules from historical operation data using the C4.5 algorithm. Thus, in this paper, the C4.5 algorithm is first introduced; then, the generation of the flood control operation dataset, the construction of decision tree-based (DT-based) rules, and the subsequent design of a real-time operating scheme are detailed. A case study of the Rizhao Reservoir is then employed to demonstrate the feasibility and even superiority of the operating scheme formulated using DT-based rules. Compared with previously proposed conventional and optimal reservoir operation methods, the DT-based method has the advantages of strong and convenient adaptability, enabling decision makers to effectively guide real-time reservoir operation.
Construction and Application of Reservoir Flood Control Operation Rules Using the Decision Tree Algorithm
Current conventional and optimal reservoir flood control operation methods insufficiently utilize historical reservoir operation data, which include rainfall, runoff generation, and inflow from the watershed, as well as the operational experience of decision makers over many years. Therefore, this study proposed and evaluated a new method for extracting reservoir flood control operation rules from historical operation data using the C4.5 algorithm. Thus, in this paper, the C4.5 algorithm is first introduced; then, the generation of the flood control operation dataset, the construction of decision tree-based (DT-based) rules, and the subsequent design of a real-time operating scheme are detailed. A case study of the Rizhao Reservoir is then employed to demonstrate the feasibility and even superiority of the operating scheme formulated using DT-based rules. Compared with previously proposed conventional and optimal reservoir operation methods, the DT-based method has the advantages of strong and convenient adaptability, enabling decision makers to effectively guide real-time reservoir operation.
Construction and Application of Reservoir Flood Control Operation Rules Using the Decision Tree Algorithm
Yanfang Diao (Autor:in) / Chengmin Wang (Autor:in) / Hao Wang (Autor:in) / Yanli Liu (Autor:in)
2021
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Metadata by DOAJ is licensed under CC BY-SA 1.0
Multi-Objective Decision Model of Reservoir Flood Control Operation
British Library Conference Proceedings | 2012
|Application of HSMAAOA Algorithm in Flood Control Optimal Operation of Reservoir Groups
DOAJ | 2023
|Optimal Hedging Rules for Reservoir Flood Operation from Forecast Uncertainties
British Library Online Contents | 2014
|