Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Applying metaheuristic strategies in construction projects management
This work deals with the application of artificial intelligence instruments in a building schedule. In this article there was presented an original optimization scatter search algorithm taking into consideration both technological and organizational restrictions. This algorithm was applied to the real analysis of the industrial building project realization.
Applying metaheuristic strategies in construction projects management
This work deals with the application of artificial intelligence instruments in a building schedule. In this article there was presented an original optimization scatter search algorithm taking into consideration both technological and organizational restrictions. This algorithm was applied to the real analysis of the industrial building project realization.
Applying metaheuristic strategies in construction projects management
Wojciech Boejko (Autor:in) / Zdzisław Hejducki (Autor:in) / Mieczysław Wodecki (Autor:in)
2012
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Metadata by DOAJ is licensed under CC BY-SA 1.0
Identifying Political Risk Management Strategies in International Construction Projects
DOAJ | 2018
|Construction projects : improvement strategies, quality management and potential challenges
UB Braunschweig | 2017
|