Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Optimization of Ground Source Heat Pump System Based on TRNSYS in Hot Summer and Cold Winter Region
A cooling tower-assisted ground source heat pump system is proposed to solve the problem of soil heat accumulation in areas with hot summers and mild winters. TRNSYS is used to establish the simulation model of the ground source heat pump system. Taking the ground source heat pump demonstration project in Nanchang City as the research object, the operation effect of the ground source heat pump is simulated and analyzed. The key parameters of the optimization system are proposed, and the operation time of the cooling tower is controlled. The optimization results show that the cooling tower can not only improve the system performance in a short time but also enable long-term stable and efficient operation of the refrigeration system, the compound ground source heat pump system optimized by the cooling tower has almost no soil heat accumulation, and the system performance has been improved. The optimal running time of the cooling tower is 3216~4344 h and 5424~6696 h, and the system running effect is the best at this time. The research results can provide a theoretical basis for the optimal design of the cooling tower auxiliary ground source heat pump system.
Optimization of Ground Source Heat Pump System Based on TRNSYS in Hot Summer and Cold Winter Region
A cooling tower-assisted ground source heat pump system is proposed to solve the problem of soil heat accumulation in areas with hot summers and mild winters. TRNSYS is used to establish the simulation model of the ground source heat pump system. Taking the ground source heat pump demonstration project in Nanchang City as the research object, the operation effect of the ground source heat pump is simulated and analyzed. The key parameters of the optimization system are proposed, and the operation time of the cooling tower is controlled. The optimization results show that the cooling tower can not only improve the system performance in a short time but also enable long-term stable and efficient operation of the refrigeration system, the compound ground source heat pump system optimized by the cooling tower has almost no soil heat accumulation, and the system performance has been improved. The optimal running time of the cooling tower is 3216~4344 h and 5424~6696 h, and the system running effect is the best at this time. The research results can provide a theoretical basis for the optimal design of the cooling tower auxiliary ground source heat pump system.
Optimization of Ground Source Heat Pump System Based on TRNSYS in Hot Summer and Cold Winter Region
Hua Zhang (Autor:in) / Shuren Hao (Autor:in) / Mingxing Wen (Autor:in) / Ximin Bai (Autor:in) / Lihong Liu (Autor:in) / Pengqiong Zhang (Autor:in)
2024
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Metadata by DOAJ is licensed under CC BY-SA 1.0
Operation Research of Air Source Heat Pump Coupled Electric Boiler Heating System Based on TRNSYS
Springer Verlag | 2023
|Operation analysis of the air-source heat pump using TRNSYS simulation tool
BASE | 2021
|Trans Tech Publications | 2013
|