Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
An Optimal Preventive Maintenance Policy for a Solar Photovoltaic System
In this paper, we develop a preventive maintenance (PM) strategy for a solar photovoltaic system composed of solar panels functioning as a series system. The photovoltaic system is considered in a failed state whenever its efficiency drops below a predefined threshold or any electrical wiring element is damaged. In such a situation of failure, a minimal repair is performed. The proposed PM strategy suggests systematically replacing n panels with their respective wiring system every time units T over a finite operating time span H. The panels to be preventively replaced are selected by the maintenance agent after an on-site overall assessment of all panels, making sure every time not to replace panels previously replaced during a given replacement cycle of all panels of the system. An analytical model is proposed in order to simultaneously determine the optimal PM period, T, and the optimal number of solar panels, n, to be replaced at each PM. This is done by modeling and minimizing the expected total maintenance cost over the finite operating time horizon H. A numerical example is presented to illustrate the use of the proposed modelling approach and to discuss the obtained results. The latter provide the optimal solutions (T*, n*) for different combinations of input parameters. They also show the economic relevance of the proposed PM strategy through estimation of the economic gain when comparing the situations with and without preventive maintenance.
An Optimal Preventive Maintenance Policy for a Solar Photovoltaic System
In this paper, we develop a preventive maintenance (PM) strategy for a solar photovoltaic system composed of solar panels functioning as a series system. The photovoltaic system is considered in a failed state whenever its efficiency drops below a predefined threshold or any electrical wiring element is damaged. In such a situation of failure, a minimal repair is performed. The proposed PM strategy suggests systematically replacing n panels with their respective wiring system every time units T over a finite operating time span H. The panels to be preventively replaced are selected by the maintenance agent after an on-site overall assessment of all panels, making sure every time not to replace panels previously replaced during a given replacement cycle of all panels of the system. An analytical model is proposed in order to simultaneously determine the optimal PM period, T, and the optimal number of solar panels, n, to be replaced at each PM. This is done by modeling and minimizing the expected total maintenance cost over the finite operating time horizon H. A numerical example is presented to illustrate the use of the proposed modelling approach and to discuss the obtained results. The latter provide the optimal solutions (T*, n*) for different combinations of input parameters. They also show the economic relevance of the proposed PM strategy through estimation of the economic gain when comparing the situations with and without preventive maintenance.
An Optimal Preventive Maintenance Policy for a Solar Photovoltaic System
Amir Baklouti (Autor:in) / Lahcen Mifdal (Autor:in) / Sofiene Dellagi (Autor:in) / Anis Chelbi (Autor:in)
2020
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Metadata by DOAJ is licensed under CC BY-SA 1.0
An optimal sequential preventive maintenance policy under stochastic maintenance quality
Online Contents | 2011
|An optimal sequential preventive maintenance policy under stochastic maintenance quality
Taylor & Francis Verlag | 2011
|Preventive maintenance for solar water heaters
British Library Online Contents | 2014
Engineering Index Backfile | 1950
|Wiley | 1969
|