Circular Public Procurement through Integrated Contracts in the Infrastructure Sector
Public clients’ procurement strategies are central in facilitating innovation towards sustainability. In the infrastructure sector, the three main project activities—design, production, and maintenance—are traditionally not procured in an integrated way, which results in sub-optimizations and a lack of life cycle perspective. As project actors are accustomed to traditional, non-integrated forms of contract, implementing integrated contracts imposes fundamental changes to the interdependencies among actors, resources, and activities. This study analyzes the interfaces among key project actors and the related interdependencies across design, production, and maintenance in Design–Build–Maintain contracts, and initiates a discussion on how to manage these interdependencies when implementing integrated contracts. This study of circular public procurement (CPP) focused on three infrastructure projects using integrated contracting and applied the industrial network approach (INA) to analyze interdependencies in how they may influence innovation and sustainable development. The study found significant obstacles to clients obtaining the benefits of integrated contracting and concludes that understanding interdependencies is necessary to implement integrated contracts successfully. The study contributes to the construction management literature by adapting the INA to contracting, and to the CPP literature by providing empirical evidence of sustainability and circularity in infrastructure projects.
Circular Public Procurement through Integrated Contracts in the Infrastructure Sector
Public clients’ procurement strategies are central in facilitating innovation towards sustainability. In the infrastructure sector, the three main project activities—design, production, and maintenance—are traditionally not procured in an integrated way, which results in sub-optimizations and a lack of life cycle perspective. As project actors are accustomed to traditional, non-integrated forms of contract, implementing integrated contracts imposes fundamental changes to the interdependencies among actors, resources, and activities. This study analyzes the interfaces among key project actors and the related interdependencies across design, production, and maintenance in Design–Build–Maintain contracts, and initiates a discussion on how to manage these interdependencies when implementing integrated contracts. This study of circular public procurement (CPP) focused on three infrastructure projects using integrated contracting and applied the industrial network approach (INA) to analyze interdependencies in how they may influence innovation and sustainable development. The study found significant obstacles to clients obtaining the benefits of integrated contracting and concludes that understanding interdependencies is necessary to implement integrated contracts successfully. The study contributes to the construction management literature by adapting the INA to contracting, and to the CPP literature by providing empirical evidence of sustainability and circularity in infrastructure projects.
Circular Public Procurement through Integrated Contracts in the Infrastructure Sector
Sofia Lingegård (Autor:in) / Malena I. Havenvid (Autor:in) / Per-Erik Eriksson (Autor:in)
2021
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Metadata by DOAJ is licensed under CC BY-SA 1.0
Infrastructure procurement capacity gaps in Nigeria public sector institutions
Emerald Group Publishing | 2019
|Contracts Procurement in Public Project vs. Private Sector Projects in Saudi Arabia
British Library Conference Proceedings | 2000
|Prejudice in public sector procurement
British Library Online Contents | 2008
|Procurement of public sector facilities
Emerald Group Publishing | 2014
|