Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Highway - corridor Vc geological of research subphase one in to his construction
In the seventies of the 20th century, by the UNDP and the Geneva initiative was launched, and later proposed improvement plan for the motorway network in Europe. As part of this plan was formed TEM project which envisages the construction of the highway Baltic Sea - Adriatic Sea (Baltic - Adriatic). Corridor Vc is part of the TEM network - transport The infrastructure of Southeast Europe. At the beginning of the XXI century, initiated the construction of Corridor Vc, most of which passes through Bosnia and Herzegovina. The choice of route alternatives times the rod is based on the most favorable natural conditions of the terrain and road connectivity with major urban areas. Construction of the highway is planned for 15-20 years, per share, giving priority to traffic interesting stock and the ability to secure the necessary funds. One of SUBPHASE in construction time the research and study of the geological features of the ground, which in some parts of the motorway route, preferring the position of of the route. The paper gives an overview of the specific section of the highway in the Serbian Republic.
Highway - corridor Vc geological of research subphase one in to his construction
In the seventies of the 20th century, by the UNDP and the Geneva initiative was launched, and later proposed improvement plan for the motorway network in Europe. As part of this plan was formed TEM project which envisages the construction of the highway Baltic Sea - Adriatic Sea (Baltic - Adriatic). Corridor Vc is part of the TEM network - transport The infrastructure of Southeast Europe. At the beginning of the XXI century, initiated the construction of Corridor Vc, most of which passes through Bosnia and Herzegovina. The choice of route alternatives times the rod is based on the most favorable natural conditions of the terrain and road connectivity with major urban areas. Construction of the highway is planned for 15-20 years, per share, giving priority to traffic interesting stock and the ability to secure the necessary funds. One of SUBPHASE in construction time the research and study of the geological features of the ground, which in some parts of the motorway route, preferring the position of of the route. The paper gives an overview of the specific section of the highway in the Serbian Republic.
Highway - corridor Vc geological of research subphase one in to his construction
Đurić Neđo (Autor:in)
2014
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Metadata by DOAJ is licensed under CC BY-SA 1.0
HIGHWAY CONSTRUCTION IMPACTS ON CORRIDOR H WATERSHEDS
British Library Conference Proceedings | 2020
|Rural highway route corridor selection
Taylor & Francis Verlag | 1977
|A highway corridor planning model: QROAD
Online Contents | 2002
|Research on Advanced Geological Prediction in Highway Double-Arch Tunnel Construction
Trans Tech Publications | 2012
|