Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Stakeholder Perceptions about Incorporating Externalities and Vulnerability into Benefit–Cost Analysis Tools for Watershed Flood Risk Mitigation
Multi-scalar climate hazards in watersheds and growing consideration regarding equity call for innovation in how agencies evaluate and prioritize mitigation and adaptation projects. Benefit–Cost Analysis (BCA) is one approach that is increasingly being applied to decision-making (i.e., FEMA BCA toolkit), but that has not been applied to watershed and equity-based flood management initiatives. This paper addresses this topic and presents a case study evaluating projects for watershed flood and climate mitigation projects by the Louisiana Watershed Initiative (Louisiana, USA). Through semi-structured interviews with stakeholders and practitioners, we found that BCA tool design must be embedded in the program and policy in order to be successfully applied and that equity has not traditionally been a core value of mitigation practice. Even though many stakeholders understand the need for incorporating environmental and social project consequences at a watershed scale, challenges to doing so include inequitable barriers to project design in competitive processes, the complexity of integrating modeling and environmental outcomes data, jurisdictional interests, and the need for better science communication with local decision-makers.
Stakeholder Perceptions about Incorporating Externalities and Vulnerability into Benefit–Cost Analysis Tools for Watershed Flood Risk Mitigation
Multi-scalar climate hazards in watersheds and growing consideration regarding equity call for innovation in how agencies evaluate and prioritize mitigation and adaptation projects. Benefit–Cost Analysis (BCA) is one approach that is increasingly being applied to decision-making (i.e., FEMA BCA toolkit), but that has not been applied to watershed and equity-based flood management initiatives. This paper addresses this topic and presents a case study evaluating projects for watershed flood and climate mitigation projects by the Louisiana Watershed Initiative (Louisiana, USA). Through semi-structured interviews with stakeholders and practitioners, we found that BCA tool design must be embedded in the program and policy in order to be successfully applied and that equity has not traditionally been a core value of mitigation practice. Even though many stakeholders understand the need for incorporating environmental and social project consequences at a watershed scale, challenges to doing so include inequitable barriers to project design in competitive processes, the complexity of integrating modeling and environmental outcomes data, jurisdictional interests, and the need for better science communication with local decision-makers.
Stakeholder Perceptions about Incorporating Externalities and Vulnerability into Benefit–Cost Analysis Tools for Watershed Flood Risk Mitigation
Thomas H. Douthat (Autor:in) / Fahmida Akhter (Autor:in) / Rachelle Sanderson (Autor:in) / Jerrod Penn (Autor:in)
2023
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Metadata by DOAJ is licensed under CC BY-SA 1.0
Flood Risk Mitigation Using Watershed Management Tools: Petra Area (Jordan)
British Library Conference Proceedings | 2001
|Polycentric spatial development, externalities and cost-benefit analysis
Online Contents | 1991
|Flash flood mitigation using watershed management tools: Petra Area (Jordan)
British Library Conference Proceedings | 2002
|Cost benefit analysis and flood damage mitigation in the Netherlands
UB Braunschweig | 2004
|