Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Model Terintegrasi Penjadwalan Batch dan Pm dengan Kriteria Minimalisasi Biaya Simpan, Setup dan Pm pada Mesin dengan Increasing Failure Rate
Development of today's manufacturing systems leads to the getting shorter in product life cycle, more variety of products, as well as increasing in consumer demand for quality and timeliness. Thus the accuracy and speed of decision-making within the manufacturing system becomes important. This paper proposes an integrated model of batch scheduling and preventive maintenance scheduling, in assumption no non-conforming parts to the criteria of minimizing the total saving cost, setup cost, preventive maintenance cost in minimizing the actual flow time on a machine with increasing failure rate. An example is provided to show how the model and algorithm work.
Model Terintegrasi Penjadwalan Batch dan Pm dengan Kriteria Minimalisasi Biaya Simpan, Setup dan Pm pada Mesin dengan Increasing Failure Rate
Development of today's manufacturing systems leads to the getting shorter in product life cycle, more variety of products, as well as increasing in consumer demand for quality and timeliness. Thus the accuracy and speed of decision-making within the manufacturing system becomes important. This paper proposes an integrated model of batch scheduling and preventive maintenance scheduling, in assumption no non-conforming parts to the criteria of minimizing the total saving cost, setup cost, preventive maintenance cost in minimizing the actual flow time on a machine with increasing failure rate. An example is provided to show how the model and algorithm work.
Model Terintegrasi Penjadwalan Batch dan Pm dengan Kriteria Minimalisasi Biaya Simpan, Setup dan Pm pada Mesin dengan Increasing Failure Rate
Zahedi Zahedi (Autor:in)
2013
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Metadata by DOAJ is licensed under CC BY-SA 1.0
PERANCANGAN ULANG TATA LETAK FASILITAS PADA PT. STU DENGAN KRITERIA MINIMASI BIAYA
DOAJ | 2019
|MODEL ESTIMASI TERINTEGRASI BIAYA LANGSUNG PELAKSANAAN KONSTRUKSI DENGAN JADWAL PELAKSANAAN
BASE | 2009
|Perancangan Sistem Penjadwalan Mesin Hybrid Flow Shop dengan Algoritma Levyflight Discrete Firefly
DOAJ | 2014
|